Tender Value
₹3.1 L
EMD Value
₹3,200
Closing Date
5 May 2022, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
De-scoping Balance works - Providing entrance gate to the left flank of newly constructed crossover for Raw water pipeline bridge and other balance works to the Bridge of MTPS -II at Mettur Dam.
2022_EB_229738_1
SE/ CIVIL / MTPS-II / OT.03 / 2022-23
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam
2 documents required · 2 mandatory
₹0
₹3,200
Yes
9 May 2022
20 Apr 2022
6 May 2022
20 Apr 2022
5 May 2022
20 Apr 2022
Amount
Clearing Scrub and Light jungle and disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.
Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.A)In all types of soils such as earth, SDR, medium rock, dense medium rock not requiring blasting.
Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.B) Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited.
Supplying and filling river sand / M sand well watered and consolidated in foundation and basement in layers complying with standard specification as directed by the Engineer in charge including cost of all materials, all labour charges, lead, lift, T&Ps etc., complete.
Providing P.C.C. 1:4:8 using 40mm HBG metal for foundation and Basement as directed by the Engineer in charge including cost of all materials, labour charges, curing, T&P, leads, lifts etc., complete.
Providing R.C.C. M20 GRADE for footings and encasing the structural column using 12mm to 20mm graded HBG metal with minimum cement content of 300kg/m³ and maximum water-cement ratio of 0.5 as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing, all T&P, lead, lift etc., complete but excluding cost of steel reinforcement.
Providing steel reinforcement for all RCC works including cutting, bending, binding, tying and placing in position including cost of steel, binding wire, lead, lift and etc., complete as directed by the Engineer in charge at site.
Providing, fabricating and fixing in postion of MS Gates, with ISMB 300x140mm for vertical column on both ends with base plate of size 450 x 450 x 8mm thick, cleat angle of size 75 x 75 x 6mm, foundation bolts L frame for anchoring provided with 25mm dia rod. The shutters provided with MS rectangular hollow section of size 2' x 1' x 4mm and the wicket provided with same section. The cost includes cost of all required accessories such as locking arrangements, stiffeners to the vertical column, handle, 3 Nos. hinges with 50mm NB pipes (OD 60.3mm ) and rod on each side, handle with 32mm dia rod etc., rails and rollers suitable for moving , including cost of fabrication, transporting, lifting and fixing rigidly, cost of all materials, labour charges, lead, lift, T&P, etc.,. The cost also includes MS Grills using flats for sprouts opeining on bridge etc., as per approved design drawing and as directed by the Engineer in charge etc., complete.
Refilling with excavated earth well -watered and consolidated in layers of not more than 150mm thick in foundation and basement as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete.
Painting the steel work with two coats of approved quality & colour Satin / Matt finish enamel paint over a coat of primer of anticorrosive red oxide including cost of all materials, brushes, lead, lift etc., complete.
SabhariAndCo
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .