Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC 27 2 1ST MAIN ROAD GOKULA 1ST STAGE 1ST PHASE BANGALORE 560054 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560054 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹30.7 L+₹2.5 L (8.84%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹32.0 L+₹3.7 L (13.2%)Rejected-Finance | L3 | Rejected-Finance NOT BEING LOWEST | |
| 4 | L4₹32.2 L+₹3.9 L (13.9%)Rejected-Finance | L4 | Rejected-Finance NOT BEING LOWEST | |
| 5 | L4₹32.2 L+₹3.9 L (13.9%)Rejected-Finance | L4 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Shri Sant Cosntruction L2 | Parmanand Enterprises L4 | George Electricals L1 | M/S SANDEEP CONSTRUCTION COMPANY L5 | S M MISHRA L6 | A.B.CONSTRUCTION L6 | R k construction L8 | shree ram enterprises L7 | M/s Mangesh Nikam L4 | D H L ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/in All kind of soil (Where blasting Prohibited) for foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm on plan),including dressing of sides and ramming of bottoms,lift upto 1.5m,including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m complete all as specified and as directed | 178 | Cum | 250 ₹44,500 | 180 ₹32,040 | 140 ₹24,920 Lowest | 180 ₹32,040 | 180 ₹32,040 | 180 ₹32,040 | 180 ₹32,040 | 180 ₹32,040 | 180 ₹32,040 | 180 ₹32,040 |
| 2.00 | Returning, filling in the any type of soil including spreading, levelling. Watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. | 110 | Cum | 200 ₹22,000 | 30 ₹3,300 | 20 ₹2,200 Lowest | 30 ₹3,300 | 30 ₹3,300 | 30 ₹3,300 | 30 ₹3,300 | 30 ₹3,300 | 30 ₹3,300 | 30 ₹3,300 |
| 3.00 | Demolition of Brick/precast concrete block/Stone/boulder masonary walling built in cement mortar all as specified and directed. | 15 | Cum | 200 ₹3,000 Lowest | 300 ₹4,500 | 240 ₹3,600 | 300 ₹4,500 | 300 ₹4,500 | 300 ₹4,500 | 300 ₹4,500 | 300 ₹4,500 | 300 ₹4,500 | 300 ₹4,500 |
| 4.00 | M&L pre-cast cement concrete(20mm graded crushed stone aggregate) 1:3:6 type C-1 as in block masonery exc 10cm in width with solid block masonery with solid blocks,exc.10cm in width and setting in cement mortar 1:4 all as Specified. | 30 | Cum | 2,500 ₹75,000 Lowest | 4,000 ₹1,20,000 | 2,500 ₹75,000 Lowest | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 | 4,000 ₹1,20,000 |
| 5.00 | M&L random rubble stone masonary well bonded bedded solidily hearted in CM 1:4. | 5 | Cum | 6,000 ₹30,000 | 3,000 ₹15,000 | 2,300 ₹11,500 Lowest | 3,000 ₹15,000 | 3,000 ₹15,000 | 3,000 ₹15,000 | 3,000 ₹15,000 | 3,000 ₹15,000 | 3,000 ₹15,000 | 3,000 ₹15,000 |
| 6.00 | -ditto- all as per item no 5 above but except stones. | 10 | Sqm | 3,000 ₹30,000 | 500 ₹5,000 | 350 ₹3,500 Lowest | 500 ₹5,000 | 500 ₹5,000 | 500 ₹5,000 | 500 ₹5,000 | 500 ₹5,000 | 500 ₹5,000 | 500 ₹5,000 |
| 7.00 | Taking down cement plaster on brick or concrete surfaces including racking out joints hacking for key, scrubbing down with water etc. complete all as specified and as directed | 150 | Sqm | 20 ₹3,000 | 10 ₹1,500 | 8 ₹1,200 Lowest | 10 ₹1,500 | 10 ₹1,500 | 10 ₹1,500 | 10 ₹1,500 | 10 ₹1,500 | 10 ₹1,500 | 10 ₹1,500 |
| 8.00 | M&L for 10mm thick rendering on fair faces of brick works finished even andfair without using extra cement in cement mortar 1: 4 complete all as specified and as directed | 200 | Sqm | 300 ₹60,000 | 160 ₹32,000 | 135 ₹27,000 Lowest | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 |
| 9.00 | M&L for 15 mm thick rendering on stone masonry works or other than fair faces of brick work or concrete surface finished even and fair without using extra cement in cement mortar 1: 4 complete all as specified and as directed | 100 | Sqm | 200 ₹20,000 | 170 ₹17,000 | 135 ₹13,500 Lowest | 170 ₹17,000 | 170 ₹17,000 | 170 ₹17,000 | 170 ₹17,000 | 170 ₹17,000 | 170 ₹17,000 | 170 ₹17,000 |
| 10.00 | M&L for 20 mm thick rendering on stone masonry works or other than fair faces of brick work or concrete surface finished even and fair without using extra cement in cement mortar 1: 4 complete all as specified and as directed | 50 | Sqm | 200 ₹10,000 | 180 ₹9,000 | 135 ₹6,750 Lowest | 180 ₹9,000 | 180 ₹9,000 | 180 ₹9,000 | 180 ₹9,000 | 180 ₹9,000 | 180 ₹9,000 | 180 ₹9,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
8 Oct 2025, 6:00 pmClosed
Garrison Engineer
GE AF LOHEGAON PUNE-411032
REPAIRS, CLEANING AND DAILY MAINT OF SEWAGE LINES, SEPTIC TANKS , UG SUMP AND REPAIRS TO COMPOUND WALL, FENCING, PATHWAY, DRAIN AND HARDSTANDING AT NP, BILLET AND TECH AREA UNDER AGE B/R -I AT GE AF LOHEGAON
2025_MES_731722_1
8974
Open Tender
Civil Works
Item Rate
180 days
NP AREA, BILLET, TECH AREA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE AF LOHEGAON
₹60,000
Yes
4 Dec 2025
19 Sept 2025
13 Oct 2025
19 Sept 2025
8 Oct 2025
3 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .