| 1 | | Removing the out of plumb bulged dilapidated Entrance gate roof slabs beams enclosure walls etc with the help of Skilled labour mechanical equipment hydraulic machinery
Crane after proper documentation like numbering
Drawing Photo documentation etc complete | 312 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 2 | | Careful removal of Earth mixed with boulders of the entrance basements and between the veenering walls both south and north sides of the gateway | 398 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 3 | | Restoration of the removed architectural members of the entrance gate with the help of high skilled labour mechanical equipment hydraulic Machinery Crane as per the original | 312 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 4 | | Back filling the Veneering walls Entrance Basements with boulders and gravel including Consolidation watering etc complete | 398 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 5 | | Providing missing roof slabs with new stone members including 2 line dressing etc average thickness of the roof slabs is 25 cms as per original and erection charges with the help of Hydraulic equipment Crane and Skilled labour etc complete | 2 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 6 | | Providing fresh granite stone members forthe missing portions of veneering wall both South and North sides of the Gateway and Entrance basements | 8 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 7 | | Providing and laying weather proof course with lime surkhi Lime and Brick Jelly 20mm size in ratio of 1 part lime 2 part sand including mixing with binding materials kadakai jaggery etc pointing the joints in lime mortar 1 part sand 1 part Lime 1 part Surki filling the concrete tamping with wooden ballet plastering top surface in lime mortar 1 part sand 1 part Lime 1 part Surki mixing the binding materials curing covering with gunny bags watering etc complete | 6 | Cum | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 8 | | Providing the Gravel to the pathway for easy movement of the visitors by leveling and compacting etc complete | 1,590 | Sqm | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |
| 9 | | Providing pointing to the Veneering wall Gateway Entrance Basements with lime mortor 1part sand 1 part Lime 1 part Surkietc Complete | 234 | Sqm | Kiran Babu 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 | 180 |