Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 LAccepted-AOC DADAWA KURIYAR KHAS BASTI BASTI UTTAR PRADESH 272178 | BASTI | UTTAR PRADESH | 272178 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹38.1 L+₹1.4 L (3.95%)Rejected-Finance | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹39.6 L+₹2.9 L (7.93%)Rejected-Finance 32 H I G AWAS VIKAS COLONY SECTOR 3 BODLA AGRA UP 282007 | AGRA | AGRA | UP | 282007 | L3 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | MNR ASSOCIATES L2 | m/s shanti consruction co L3 | Abhi Construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.5m wide and nexc 1.5m in depth as in foundation etc as in any type of soil complete all as specified and directed. | 102.6 | Cum | 180 ₹18,468 | 250 ₹25,650 | 170 ₹17,442 Lowest |
| 2.00 | M&L PCC Type D2 (1:4:8) using 40mm graded stone agg as in foundation filling mass concrete complete all as specified and directed. | 7 | Cum | 4,800 ₹33,600 | 2,800 ₹19,600 Lowest | 2,800 ₹19,600 Lowest |
| 3.00 | Returning filling in including spreading levelling watering and well ramming in layers nexc 25cm as in soil complete all as specified and directed. | 72.34 | Cum | 240 ₹17,361.6 | 50 ₹3,617 | 40 ₹2,893.6 Lowest |
| 4.00 | Removing excavated material nexc 50m and depositing where directed at a level nexc 1.5m above the starting point with soil complete all as specified and directed. | 30.26 | Cum | 300 ₹9,078 | 90 ₹2,723.4 | 50 ₹1,513 Lowest |
| 5.00 | M&L RCC M-25 design mix (20 mm graded stone aggregate) as in foundation , raft, footing, plinth beam, base for column etc complete all as specified and directed. | 17.79 | Cum | 7,200 ₹1,28,088 | 6,000 ₹1,06,740 Lowest | 6,250 ₹1,11,187.5 |
| 6.00 | M&L RCC M-25 design mix (20 mm graded stone aggregate) as in column complete all as specified and directed. | 26.68 | Cum | 7,200 ₹1,92,096 | 6,000 ₹1,60,080 Lowest | 6,250 ₹1,66,750 |
| 7.00 | M&L RCC M-25 design mix (20 mm graded stone aggregate) as in roof beams, chajja lintle etc. complete all as specified and directed. | 30.09 | Cum | 7,200 ₹2,16,648 | 6,000 ₹1,80,540 Lowest | 6,250 ₹1,88,062.5 |
| 8.00 | M&L RCC M-25 design mix (20 mm graded stone aggregate) as in slabs suppoorted on walls,beams and column in floors, roof, landings, balconies, canopies, deck slab and in shevels for almirah the like similar work etc complete all as specified and directed. | 27.02 | Cum | 7,200 ₹1,94,544 | 6,000 ₹1,62,120 Lowest | 6,250 ₹1,68,875 |
| 9.00 | M&L Formwork to side of concrete foundation footing base of column raft beam and plinth beam with required gap filler etc complete all as specified and directed. | 52.2 | Sqm | 200 ₹10,440 Lowest | 400 ₹20,880 | 380 ₹19,836 |
| 10.00 | M & L form work to side/bottom of pillars , post , column, beam, slab square , rectangular or polygonal required gap filler etc complete all as specified and directed. | 256.5 | Sqm | 200 ₹51,300 Lowest | 400 ₹1,02,600 | 400 ₹1,02,600 |
Tender Value
₹39.9 L
EMD Value
₹80,000
Closing Date
15 Oct 2025, 6:00 pmClosed
GE (East) Agra
Garrison Engineer (East) Agra, Military Engineer Services, Gwalior House, 62 Taj Road Agra Cantt-282001
PROVN OF COY STORE, CLO, LPG, HYG AND CHEMICAL STORE AT 509 ABW UNDER GE (EAST) AGRA
2025_MES_731278_1
9828/E8
Open Tender
Civil Works
Item Rate
180 days
Agra Cantt
Please refer tender documents
10 documents required · 10 mandatory
₹500
GE (East) Agra
₹80,000
Yes
2 Dec 2025
17 Sept 2025
17 Oct 2025
17 Sept 2025
15 Oct 2025
1 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .