| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-AOC VILLAGE CHANNI POST OFFICE SATTANI DISTT UDHAMPUR UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC ACCEPTED BEING LOWEST BIDDER | |
| 2 | L2₹30.6 L+₹3.6 L (13.3%)Rejected-Finance MAIN ROAD KANDOLI NAGROTA JAMMU J K 181221 | JAMMU | JAMMU AND KASHMIR | 181221 | L2 | Rejected-Finance NOT LOWEST BIDDER | |
| 3 | L3₹30.7 L+₹3.7 L (13.6%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST BIDDER | |
| 4 | L4₹32.3 L+₹5.3 L (19.5%)Rejected-Finance BIR SARDALIA RESIDENCY AIR FORCE ROAD BARYAL UDHAMPUR 182101 J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-Finance NOT LOWEST BIDDER | |
| 5 | L5₹32.4 L+₹5.3 L (19.7%)Rejected-Finance | L5 | Rejected-Finance NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/S SANJAY STEEL WORKS L2 | K S BUILDERS L10 | M/S. RAM PAUL KHAJURIA & BROS. L13 | MADAN LAL SHARMA AND SONS L11 | NARESH KUMAR KHAJURIA L9 | PARAS RAM ASGOTRA AND SONS L1 | M/SHansrajbuilder L8 | SARDALIA CONST CO L4 | M/S SHARMA TRADERS L7 | SUBASH CHANDER L6 | M/S CHANOTER BUILDING MATERIAL L3 | Mandeep Construction Co L5 | MAHADEV ENTERPRISES L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down existing roof treatment of water proofing of any description including plaster and cleaning top surfaces with wire brushes complete all as specified and as directed. | 2,000 | SQM | 10 ₹20,000 | 18 ₹36,000 | 20 ₹40,000 | 30 ₹60,000 | 50 ₹1,00,000 | 15 ₹30,000 | 15 ₹30,000 | 10 ₹20,000 | 25 ₹50,000 | 22 ₹44,000 | 5 ₹10,000 Lowest | 12 ₹24,000 | 10 ₹20,000 |
| 2.00 | 10mm thick plaster in cement mortar 1:3 mixed with and incl water proofing compound @ 3% by weight of cement applied over roof slab. After the plaster is cured the roof will be tested for water tightening by ponding with water for seven days for any seepage/leakage etc. if any seepage is observed the rectfication shall be carried out by high pressure gourting under the pressure of 5 Kg/Sqm using cement grout. After the surface is repaired the slab is tested for water tightness again before processing further treatement complete all as specified and as directed | 2,000 | SQM | 140 ₹2,80,000 | 146 ₹2,92,000 | 150 ₹3,00,000 | 180 ₹3,60,000 | 200 ₹4,00,000 | 100 ₹2,00,000 Lowest | 165 ₹3,30,000 | 170 ₹3,40,000 | 180 ₹3,60,000 | 150 ₹3,00,000 | 180 ₹3,60,000 | 165 ₹3,30,000 | 160 ₹3,20,000 |
| 3.00 | Self adhesive elastomeric SBS bitumen based water proofing membrane 1.5 mm thick with coarse laminated polythene film surface. The upper side and easily removable silicon film on the underside, laid on roofs and sealing all joints and including applying bitumen primer @ 0.30 ltrs/Sqm over clean RCC roof surface complete all as specified and as directed.
Note : The work shall only be executed through authorised approved applicator by the manufacturer of membrane)
Make : Hyplas of IWL India ltd Chennai/Texas India Ltd Gurgaon and its equivalent type as per list of makes (Appendix E). | 2,000 | SQM | 446 ₹8,92,000 | 426 ₹8,52,000 | 440 ₹8,80,000 | 460 ₹9,20,000 | 450 ₹9,00,000 | 200 ₹4,00,000 Lowest | 435 ₹8,70,000 | 390 ₹7,80,000 | 395 ₹7,90,000 | 470 ₹9,40,000 | 400 ₹8,00,000 | 438 ₹8,76,000 | 450 ₹9,00,000 |
| 4.00 | Taking down existing roof treatment of water proofing of any description including plaster and cleaning top surfaces with wire brushes and incl Rendering 15mm thick on fair faces of brick work or concrete surfaces finished even and fair on walls in cement mortar(1:4), using water proofing compound incl complete all as specified and as directed.
(Note : WPC will be measured and paid for separately) | 2,000 | SQM | 140 ₹2,80,000 | 176 ₹3,52,000 | 180 ₹3,60,000 | 160 ₹3,20,000 | 150 ₹3,00,000 | 130 ₹2,60,000 | 185 ₹3,70,000 | 170 ₹3,40,000 | 160 ₹3,20,000 | 150 ₹3,00,000 | 20 ₹40,000 Lowest | 155 ₹3,10,000 | 140 ₹2,80,000 |
| 5.00 | Supply only integral water proofing compound, ISI marked, complete all as specified and as directed. | 659.81 | KG | 40 ₹26,392.4 | 110 ₹72,579.1 | 120 ₹79,177.2 | 80 ₹52,784.8 | 70 ₹46,186.7 | 35 ₹23,093.35 Lowest | 95 ₹62,681.95 | 60 ₹39,588.6 | 120 ₹79,177.2 | 85 ₹56,083.85 | 40 ₹26,392.4 | 80 ₹52,784.8 | 70 ₹46,186.7 |
| 6.00 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per square metre including cleaning surfaces complete all as specified and as directed. | 2,000 | SQM | 30 ₹60,000 Lowest | 55 ₹1,10,000 | 60 ₹1,20,000 | 40 ₹80,000 | 40 ₹80,000 | 45 ₹90,000 | 42 ₹84,000 | 30 ₹60,000 Lowest | 45 ₹90,000 | 45 ₹90,000 | 40 ₹80,000 | 42 ₹84,000 | 90 ₹1,80,000 |
| 7.00 | M&L for fixing APP based polymeric membrane minimum weighing not less than 3kg/sqm and minimum 3mm thick reinforced with polyester non-woven fabric (weight not less than 150 gm/Sqm) laid on primed surface of roofs using butane torch, and sealing all joints after and including applying bituminous primer @ 0.40 litre per square metre over clean RCC roof surfaces, complete all as specified and as directed. | 2,000 | SQM | 380 ₹7,60,000 | 400 ₹8,00,000 | 420 ₹8,40,000 | 400 ₹8,00,000 | 400 ₹8,00,000 | 295 ₹5,90,000 | 390 ₹7,80,000 | 290 ₹5,80,000 Lowest | 400 ₹8,00,000 | 360 ₹7,20,000 | 390 ₹7,80,000 | 328 ₹6,56,000 | 350 ₹7,00,000 |
| 8.00 | M&L for taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and as directed. | 100 | RM | 10 ₹1,000 Lowest | 25 ₹2,500 | 30 ₹3,000 | 20 ₹2,000 | 20 ₹2,000 | 105 ₹10,500 | 24 ₹2,400 | 20 ₹2,000 | 15 ₹1,500 | 12 ₹1,200 | 20 ₹2,000 | 12 ₹1,200 | 10 ₹1,000 Lowest |
| 9.00 | M&L for 20mm bore `Medium grade` GI tubing with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed. | 100 | RM | 20 ₹2,000 | 30 ₹3,000 | 35 ₹3,500 | 30 ₹3,000 | 20 ₹2,000 | 170 ₹17,000 | 34 ₹3,400 | 220 ₹22,000 | 20 ₹2,000 | 20 ₹2,000 | 20 ₹2,000 | 15 ₹1,500 Lowest | 200 ₹20,000 |
| 10.00 | Dismantling of water tank of capacity exc. 500 and not exc. 1000 litres and removing to store complete all as specified and as directed. | 25 | EACH | 50 ₹1,250 | 155 ₹3,875 | 160 ₹4,000 | 50 ₹1,250 | 50 ₹1,250 | 5 ₹125 Lowest | 100 ₹2,500 | 200 ₹5,000 | 150 ₹3,750 | 50 ₹1,250 | 200 ₹5,000 | 60 ₹1,500 | 100 ₹2,500 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
28 May 2026, 6:00 pmClosed
GE Army Dhar Road
GE Army Dhar Road
REPAIR TO ROOF PLASTER PAINTING CLEANING OF WATER TANKS AND OTHER CONNECTED WORKS TO CERTAIN BLDGS IN DEPOT AREA AT 15 FAD JINDRAH UNDER GE ARMY DHAR ROAD
2026_MES_764048_1
8072/NIT-19/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE Army Dhar Road
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE Army Dhar Road
₹70,000
Yes
27 Jul 2026
7 May 2026
30 May 2026
8 May 2026
28 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down existing roof treatment of water proofing of any description including plaster and cleaning top surfaces with wire brushes complete all as specified and as directed. | 2,000 | SQM | - | - |
| 2 | 10mm thick plaster in cement mortar 1:3 mixed with and incl water proofing compound @ 3% by weight of cement applied over roof slab. After the plaster is cured the roof will be tested for water tightening by ponding with water for seven days for any seepage/leakage etc. if any seepage is observed the rectfication shall be carried out by high pressure gourting under the pressure of 5 Kg/Sqm using cement grout. After the surface is repaired the slab is tested for water tightness again before processing further treatement complete all as specified and as directed | 2,000 | SQM | - | - |
| 3 | Self adhesive elastomeric SBS bitumen based water proofing membrane 1.5 mm thick with coarse laminated polythene film surface. The upper side and easily removable silicon film on the underside, laid on roofs and sealing all joints and including applying bitumen primer @ 0.30 ltrs/Sqm over clean RCC roof surface complete all as specified and as directed.
Note : The work shall only be executed through authorised approved applicator by the manufacturer of membrane)
Make : Hyplas of IWL India ltd Chennai/Texas India Ltd Gurgaon and its equivalent type as per list of makes (Appendix E). | 2,000 | SQM | - | - |
| 4 | Taking down existing roof treatment of water proofing of any description including plaster and cleaning top surfaces with wire brushes and incl Rendering 15mm thick on fair faces of brick work or concrete surfaces finished even and fair on walls in cement mortar(1:4), using water proofing compound incl complete all as specified and as directed.
(Note : WPC will be measured and paid for separately) | 2,000 | SQM | - | - |
| 5 | Supply only integral water proofing compound, ISI marked, complete all as specified and as directed. | 659.81 | KG | - | - |
| 6 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per square metre including cleaning surfaces complete all as specified and as directed. | 2,000 | SQM | - | - |
| 7 | M&L for fixing APP based polymeric membrane minimum weighing not less than 3kg/sqm and minimum 3mm thick reinforced with polyester non-woven fabric (weight not less than 150 gm/Sqm) laid on primed surface of roofs using butane torch, and sealing all joints after and including applying bituminous primer @ 0.40 litre per square metre over clean RCC roof surfaces, complete all as specified and as directed. | 2,000 | SQM | - | - |
| 8 | M&L for taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and as directed. | 100 | RM | - | - |
| 9 | M&L for 20mm bore `Medium grade` GI tubing with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed. | 100 | RM | - | - |
| 10 | Dismantling of water tank of capacity exc. 500 and not exc. 1000 litres and removing to store complete all as specified and as directed. | 25 | EACH | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tender_19.pdf
Tender Documents • 1.99 MB
BOQ_855800.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .