Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.3 L+₹9,579.76 (7.66%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹1.3 L+₹9,579.76 (7.66%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹1.5 L+₹24,548.13 (19.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
23 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O TILE PATH FROM MAIN ROAD TO MASJID SHREEF AT ALLIE MOHALLA WARD NO 6 BLOCK LARNOO
2026_RDPR_325101_4
ENIT109of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,500
27 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
23 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SITE CLEARANCE BY WAY OF ENGAGEMENT OF LABOURS | 2 | LBR | 578 | ₹1,156 |
| 2 | Earth work in excavation by manual means in trenches for foundations,
drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including
dressing of sides and ramming of bottoms lift upto 1.5 m, including getting
out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | 2.34 | Cum | 479.3 | ₹1,121.56 |
| 3 | P/L OF STONE SOILING | 5.65 | Cum | 900 | ₹5,085 |
| 4 | Providing and laying in position of specified grade of cement concrete in1:3:6 mix including curing excluding cost of centering and shuttering using 20% Plum | 10.16 | cum | 5,733.6 | ₹58,253.38 |
| 5 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick | 75.27 | cum | 816.15 | ₹61,431.61 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 23.7 | sqm | 286.35 | ₹6,786.5 |
| 7 | carriage of aggregates/sand 50 KM AND 50 M H/L | 13.82 | Cum | 941.81 | ₹13,015.81 |
| 8 | STONE SOLING | 5.65 | Cum | 236.08 | ₹1,333.85 |
| 9 | SIGN BOARD AND PHOTOGRAPH AND OTHER UNFORSEEN ITEMS | 1 | NO | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1097513.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .