| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.1 LAccepted-Finance | L-1 | Accepted-Finance Basic rate without GST | |
| 2 | L-2₹5.3 L+₹23,740 (4.66%)Accepted-Finance | L-2 | Accepted-Finance Basic rate without GST | |
| 3 | L-3₹5.4 L+₹35,061 (6.88%)Accepted-Finance 001 LANE NO 3 A SAYYED NAGAR HADPSAR HADPSAR PUNE MAHARASHTRA 411028 | PUNE | MAHARASHTRA | 411028 | L-3 | Accepted-Finance Basic rate without GST | |
| 4 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
9 Nov 2022, 2:00 pmClosed
SE EUDC-III KESCo Kanpur
Office Of SE EUDC-III H-Block Substation Kidwai Nagar KESCo, Kanpur
Replacement of Damaged Conductor to new AB Cable in the area of EUDD Naubasta, under EUDC-III, KESCo. Kanpur.
2022_KESCO_739985_1
20/EUDC-III/2022-23
Open Tender
Electrical Works
Item Wise
90 days
Under The area of EUDD Naubasta KESCo Kanpur
As per tender document
2 documents required · 2 mandatory
₹1,180
KESCo
₹5,000
17 Nov 2022
3 Nov 2022
10 Nov 2022
3 Nov 2022
9 Nov 2022
3 Nov 2022
Electrical Items :
Erection of Single S.T. Poles including all fittings
Grouting of pole with Cement, Brick Ballast and Coarse sand as per standard specification.
Making plinth of S.T. HT/LT pole of 400mm dia, 600mm height (200mm Underground) with C.C. in ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials
Painting of S.T. Poles after rubbing, cleaning with emery paper and coating with one coat of Red Oxide on Full length of pole and then two coat of aluminum paint upto X-arm from Top/above fuse set including cost of paint and Red Oxide paint used should be I.S.I. Mark Ist Class Enamel Paint
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
Earthing as per standard specifications.
Laying of Aerial Bunched Cable (3x150+1x16+1x120 Sq mm) for Erection of L.T. O/H Line.
Mounting & Erection of single phase distribution box.
Providing & Fixing of three phase distribution box.
Erection of LT Ckt
Excavation of ST Pole by digging of Pit
Dismantling of binding wire/conductor from insulators and loosening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
Discontent and Re-Connection of existing service cable of consumer
Carriage Charges (for All material of above work from KESCo Store to work site & Work Site to KESCo. Store. )
Aishani Power Supply Pvt Ltd
S.A. Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .