Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | Not Admitted-Fee/PreQual/Technical 31 2 ADAKAMARANAHALLI MAKALI POST VILLAGE DASANAPURA HOBLI BANGALORE URBAN BANGALORE RURAL KARNATAKA 562123 | BENGALURU RURAL | KARNATAKA | 562123 | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | |
| 3 | Not Admitted-Fee/PreQual/Technical 90A 2ND FLOOR AMRITPURI B EAST OF KAILASH OPPOSITE ISKON TEMPLE NEW DELHI 110065 | NEW DELHI | NEW DELHI | DELHI | 110065 | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | |
| 4 | Not Admitted-Fee/PreQual/Technical 1014 105 KINGSTON TOWER OPPOSITE OLD VIVA COLLEGE ABOVE DOMINOS PALGHAR MAHARASHTRA 401303 | PALGHAR | PALGHAR | MAHARASHTRA | 401303 | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹22.0 L
EMD Value
₹44,060
Closing Date
23 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EO MUNICIPAL BOARD NAWALGARH
EO MUNICIPAL BOARD NAWALGARH
supply and installaton of OCEMS 3MLD
2023_DLB_336313_1
ENIT 04/2023-24/02
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
supply and installaton of OCEMS 3MLD
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
EO MUNICIPAL BOARD NAWALGARH
₹44,060
Yes
8 Jun 2023
16 May 2023
24 May 2023
16 May 2023
23 May 2023
16 May 2023
Amount
Supply & Installation of On Line BOD/COD/TSS/PH in-situ based Analyzer with panel for S.T.P effluent Measurement items UV-VIS Spectrometry Double beam with entire spectrum scanning 200 – 720 nm / 190- 750nm wave lengths along with 256 unique pixel diode. •MOC of BOD/COD/TSS sensor -Titanium 3.7 / SS316L or better • Cleaning facility.-ultrasonic cleaning or Air pressure Cleaning Accuracy of BOD/COD/TSS sensor- +/-3% of the measured value • Light Source: Xenon Flash Lamp Following measuring ranges are required : • COD: 0-700 mg/lBOD: 0-400 mg/l TSS: 0-600 mg/ l Ph range - 0 to 14 • MOC of ph sensor-Stainless Steel 316 or better •Ph Accuracy +/-0.2% •protection type : IP 68 for both the Sensor and Cable (Cable lengthas per site requirement) Controller/Display- Housing Material – Non corrosive e.g.Acrylonitrile-Styrene-Acryloester polymer or better • Protection Rating IP 67 Controller/display cabin box should be IP66 Grade with lock & key SS304 Grade MOC
Ultrasonic open channel flow meter with shall comprise of Flow sensor / transducer, flow transmitter, digital level indicator / remote indicator, control unit • Operating Temperature: 0 to 50°C. • Safety: Explosion Proof or Intrinsically Safe. • Measuring Principal: Ultrasonic. • Communication Protocol: Open Protocol like MODBUS, PROFIBUS, HART, etc. • Analog Output: Isolated 4-20mA. • Relay Contacts: Minimum of 3 SPDT contacts. • Accuracy: ± 0.25% of measured value or better. •Output-. 4 - 20 mA •Protection a.) Sensor: IP-68. b.) Transmitter / Controller: IP-66 (NEMA 4X). •Display: LCD with LED backlighting 130
1kva UPS • Capacity -1000VA/600W • Input Voltage Range- 140 V ~ 300 V AC Frequency - 50 Hz ± 10% • Operating Temperature- 0°C-40°C; • Charging Time -6~8 Hours recover to 90% capacity Battery Rating -SMF 12V /7AHx2 Batteries. • Output Voltage -230 V AC Nominal Transfer Time-Typical 4~8ms • Type- Sealed Maintenance Free
Comprehensive Operation & Maintenance Cost for whole system for 1st year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 2nd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 3rd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 4th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 5th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Installation Charges
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .