Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹54,390.79 (12.3%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
15 Jun 2026, 6:00 pmClosed
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_311904_4
FRESH e-NIT No. 19 of 2026-27 Dated 09-06-2026
Open Tender
Civil Works
Percentage
10 days
kathar
NIT
2 documents required · 2 mandatory
₹600
XEN PWd Akhnoor
₹14,000
20 Jun 2026
10 Jun 2026
16 Jun 2026
10 Jun 2026
15 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. | 648 | cum | 187.3 | ₹1,21,370.4 |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 600 | sqm | 24.12 | ₹14,472 |
| 4 | Slip clearance In ordinary soils; disposal lead upto 50 m and lift upto 1.5 m. | 1,084 | cum | 154.15 | ₹1,67,098.6 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 115 | CUM | 276.6 | ₹31,809 |
| 6 | suppliying and Fixing of Twire crates including supply of stones and cost of crates including carriages (complete Job) (Size 6.0 x 1.2 x1.2) | 5 | nos each | 16,500 | ₹82,500 |
| 7 | Supplying Providing and Laying of RBM/NBM filling in layers inluding lift/lead/loading /unloading (complete job) | 210 | cum | 300 | ₹63,000 |
| 8 | Engaging JCB/ Earth excavator for clearance of Surface of roads/Minor slips/Kacha Drain /Pucca Drain/Unhygenic material/Unserviceable material/Catch pits etc incl. cost of POL etc | 150 | hrs | 1,050 | ₹1,57,500 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 2.17 | cum | 1,885.95 | ₹4,092.51 |
| 10 | Providing and Laying non pressure NP2 Class (light duty) RCC Pipes with collar jointed with stiff mixture of cement mortar in proportion of 1:2 including testing of joints etc. complete
20.5.10 (900 mm Dia R.C.C Pipe) | 7.5 | MTR | 2,902.25 | ₹21,766.88 |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3 | CUM | 5,733.6 | ₹17,200.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1009790.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .