Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹3.4 L
Closing Date
29 Jun 2026, 5:00 pm
General Manager
General Manager, UPSIDA Head Office Kanpur
Construction/Repair of Boundary Wall and Foot path of Boundary Wall and Foot path of Park (Only Civil Work) for I.A. EPIP Kasna Distt- G.B. Nagar.
2026_SIDC_1158447_1
CD_II_55_DT_29052026
Open Tender
Civil Works
120 days
G.B. Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,965
UPSIDA
₹3.4 L
9 Jun 2026
9 Jun 2026
29 Jun 2026
9 Jun 2026
29 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 853.48 | Cum | 110 | ₹93,882.8 |
| 2 | Concrete with 4cm gauge stone ballast, coarse sand & cement in poroportion of 8:4:1 (8 graded stone aggregate: 4 coarse sand : 1cement : ) including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 484.89 | Cum | 6,100 | ₹29,57,829 |
| 3 | First Class Brick work in 1:4 one cement : 4 coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 723.02 | Cum | 5,170 | ₹37,38,013.4 |
| 4 | First Class Brick work in 1:4 cement & Coarse sand 2.20 F.M. mortar in superstructure including necessary cutting & moulding of brick as required thickmess of walls of one brick, Add extra labour inculding supply of all material, labour and T&P etc. required for proper completion of the work | 318.12 | Cum | 5,520 | ₹17,56,022.4 |
| 5 | Concrete with 2cm gauge approved stone bellast, coarse sand and cement in the proportion of 4:.2:1 including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 18.66 | Cum | 7,050 | ₹1,31,553 |
| 6 | 12mm thick plaster with cement and course sand of 1.25 finesess modules mortar in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 4,680.25 | Sqm | 200 | ₹9,36,050 |
| 7 | R.C.C. work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in RCC T- BEAM ,slabs roof and RCC column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 80.21 | Cum | 8,850 | ₹7,09,858.5 |
| 8 | M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape as necessary including bending for proper complition of the work and including supply of all material and wastage, bend hooks, and authorised overlapping shall be measured labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. Work Including cost of binding wire | 9,444.91 | Kg | 86.86 | ₹8,20,384.88 |
| 9 | Finishing wall with weather coat by premium acrylic exterior paint applied @ 1.67 ltr/10 sqm (asian or berger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 4,878.97 | Sqm | 140 | ₹6,83,055.8 |
| 10 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. | 1,000 | Kg | 85 | ₹85,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
feeformat.xls
Tender Documents • 0.02 MB
etenderdocuments.pdf
Tender Documents • 1.19 MB
BOQ_2171111.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid