Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 CrAccepted-Finance | L1 | Accepted-Finance .. | |
| 2 | L2₹22.7 Cr+₹1.6 Cr (7.68%)Rejected-Finance DAM ROAD TALWARA TOWNSHIP DISTT HOSHIARPUR PB | L2 | Rejected-Finance . | |
| 3 | L3₹24.0 Cr+₹2.9 Cr (13.9%)Rejected-Finance | L3 | Rejected-Finance .. | |
| 4 | L4₹24.8 Cr+₹3.7 Cr (17.5%)Rejected-Finance SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | L4 | Rejected-Finance .. | |
| 5 | L5₹25.5 Cr+₹4.4 Cr (20.9%)Rejected-Finance | L5 | Rejected-Finance .. |
| Sl No | Description | Qty | Unit | HARJEET SINGH L5 | HS Engineers and Associates L1 | SS RANA CONSTRUCTION PRIVATE LIMITED L6 | Unipro Techno Infrastructure Pvt Ltd L4 | National India Construction Co. L3 | S.k.sharma contractor and engineer L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts Excluding restoration metalled surfaces to its original condition( Will be paid Separately) & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 17,377.66 | Per Cum | 180 ₹31,27,978.8 Lowest | 397.95 ₹69,15,439.8 | 400 ₹69,51,064 | 190 ₹33,01,755.4 | 300 ₹52,13,298 | 225 ₹39,09,973.5 |
| 2.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc. consolidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 meters complete in all respect as per entire satisfaction of Engineer in Charge. | 522.46 | Per Cum | 790 ₹4,12,743.4 | 504.26 ₹2,63,455.68 | 600 ₹3,13,476 | 650 ₹3,39,599 | 500 ₹2,61,230 | 300 ₹1,56,738 Lowest |
| 3.00 | Excavation in foundation for digging well in dry excavation from G.L.upto the level,where well curb is placed the level,where well curb is placed depth complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 662.89 | Per Cum | 800 ₹5,30,312 | 556.6 ₹3,68,964.57 | 700 ₹4,64,023 | 970 ₹6,43,003.3 | 500 ₹3,31,445 | 300 ₹1,98,867 Lowest |
| 4.00Wet well sinking gravel including all pumping, soring etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | |||||||||
| 5.00 | From spring level to 3.00 mtr.depth | 855.05 | Per Cum | 5,200 ₹44,46,260 | 2,905.57 ₹24,84,407.63 Lowest | 5,700 ₹48,73,785 | 5,940 ₹50,78,997 | 3,700 ₹31,63,685 | 3,800 ₹32,49,190 |
| 6.00 | From spring level to 3.00 metre to 6.00 metre Depth | 855.05 | Per Cum | 6,200 ₹53,01,310 | 4,293.62 ₹36,71,259.78 | 6,600 ₹56,43,330 | 7,100 ₹60,70,855 | 3,900 ₹33,34,695 Lowest | 4,800 ₹41,04,240 |
| 7.00 | From spring level to 6.00 mtr.depth to 9.00 metre depth | 598.5 | Per Cum | 7,200 ₹43,09,200 | 5,586.75 ₹33,43,669.88 | 7,600 ₹45,48,600 | 7,910 ₹47,34,135 | 4,200 ₹25,13,700 Lowest | 5,800 ₹34,71,300 |
| 8.00 | Steel work in single section i/c cutting, hoisting & fixing in position etc.in RS joists,Channels,angles & tees etc. | 106.7 | Per Qtls | 11,500 ₹12,27,050 | 7,645.12 ₹8,15,734.3 Lowest | 11,500 ₹12,27,050 | 10,870 ₹11,59,829 | 12,500 ₹13,33,750 | 10,500 ₹11,20,350 |
| 9.00 | Lowering of well curb complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 79.06 | Per Qtls | 170 ₹13,440.2 | 150.29 ₹11,881.93 | 195 ₹15,416.7 | 15,400 ₹12,17,524 | 200 ₹15,812 | 150 ₹11,859 Lowest |
| 10.00Providing and laying cement concrete work using concrete mix of M-25 not leaner than 1:1.5:3 with graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in | |||||||||
Tender Value
₹26.8 Cr
EMD Value
₹27.5 L
Closing Date
27 Jul 2026, 11:00 amClosed
Executive Engineer JSV Division Hamirpur
Executive Engineer JSV Division Hamirpur
Relocation and Reconstruction of various lift water supply scheme Hamirpur Town, Chowki Chabot, Amroh, REC Lambloo on the left bank of River Beas, affected due to submergence in the pondage of Dhaulasidh in Tehsil Sujanpur, Distt. Hamirpur
2026_HPIPH_138943_1
EE-JSV-I-TA-E-tender /2025-26
Open Tender
Civil Works
Item Rate
365 days
Executive Engineer JSV Division Hamirpur
Please refer Tender documents.
13 documents required · 13 mandatory
₹30,000
₹27.5 L
Chief Engineer HZ Hamirpur
1 Oct 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts Excluding restoration metalled surfaces to its original condition( Will be paid Separately) & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 17,377.66 | Per Cum | 100 | ₹17,37,766 |
| 2 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc. consolidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 meters complete in all respect as per entire satisfaction of Engineer in Charge. | 522.46 | Per Cum | 100 | ₹52,246 |
| 3 | Excavation in foundation for digging well in dry excavation from G.L.upto the level,where well curb is placed the level,where well curb is placed depth complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 662.89 | Per Cum | 100 | ₹66,289 |
| 4 | Wet well sinking gravel including all pumping, soring etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | - | - | - | - |
| 5 | From spring level to 3.00 mtr.depth | 855.05 | Per Cum | 100 | ₹85,505 |
| 6 | From spring level to 3.00 metre to 6.00 metre Depth | 855.05 | Per Cum | 100 | ₹85,505 |
| 7 | From spring level to 6.00 mtr.depth to 9.00 metre depth | 598.5 | Per Cum | 100 | ₹59,850 |
| 8 | Steel work in single section i/c cutting, hoisting & fixing in position etc.in RS joists,Channels,angles & tees etc. | 106.7 | Per Qtls | 100 | ₹10,670 |
| 9 | Lowering of well curb complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. | 79.06 | Per Qtls | 100 | ₹7,906 |
| 10 | Providing and laying cement concrete work using concrete mix of M-25 not leaner than 1:1.5:3 with graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
F6.pdf
Tender Documents • 0.26 MB
F8.pdf
Tender Documents • 1.08 MB
Terms.pdf
Tender Documents • 0.19 MB
Termscon.pdf
Tender Documents • 0.08 MB
Datasheet.pdf
Tender Documents • 0.76 MB
BOQ_205803.xls
BOQ • 0.50 MB
Corrigend.pdf
PDF • 0.11 MB
Corrig.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .