Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹70,000
EMD Value
₹1,400
Closing Date
28 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Irrigation Division Kulgam
Irrigation Division Kulgam
Checking of leakages by way of RCC Jacketing near RD 3980 mts of Main Banimullah Canal
2026_IFC_328559_2
e NIT 16 of 2026-27
Open Tender
Civil Works - Canal
Percentage
10 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
MH 0702
₹1,400
17 Oct 2026
17 Oct 2026
28 Oct 2026
17 Oct 2026
28 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ).Wet | 1.1 | cum | 184.95 | ₹203.45 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.95 | cum | 7,104.35 | ₹35,166.53 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 33 | sqm | 286.35 | ₹9,449.55 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 149 | kgs | 123.2 | ₹18,356.8 |
| 5Carriage of material by Mechenical transport and head load from source to actual site of work including loading,unloading,stacking complete job. | |||||
| 5.1 | Cement for an avg lead of 8 KM by MT and 300mts by HL | 1.58 | MT | 421.66 | ₹666.22 |
| 5.2 | Sand for an avg lead of 18 KM by MT and 300mtr by HL | 2.23 | cum | 802.88 | ₹1,790.42 |
| 5.3 | 20mm Agg by an avg lead of 15 KM by MT and 300mtr by HL | 4.46 | cum | 763.61 | ₹3,405.7 |
| 5.4 | Steel for an avg lead 8 KM by MT and 300mtr by HL | 0.15 | MT | 652.95 | ₹97.94 |
| 5.5 | Providing,printing and arranging color photographs of the work at various stages of execuation, along with printing of necessary supporting documents , records and other relevant documents required for prepration , verification and processing of bills ,complete in all respects as directed by engineer in charge . | 10 | LS | 60 | ₹600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1112450.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .