Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC HOUSE NO 54 VILLAGE TAURU TEHSIL NUH DISTT MEWAT HARYANA 122105 | TAURU | MEWAT | HARYANA | 122105 | L1 | Accepted-AOC work allotted | |
| 2 | L2₹13.9 L+₹1.1 L (8.69%)Rejected-Finance 164 A 11 GALI NO 3 RISHI NAGAR KAITHAL 136027 | KAITHAL | HARYANA | 136027 | L2 | Rejected-Finance Rate are at higher side | |
| 3 | L3₹14.0 L+₹1.2 L (9.13%)Rejected-Finance H NO 13 BHARAT COLONY SECTOR 88 GREATER FARIDABAD DISTT FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | L3 | Rejected-Finance Rate are at higher side |
| Sl No | Description | Qty | Unit | M R CONSTRUCTION COMPANY L1 | Hariom Engineers L3 | CHARAN SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Material required- Mechanical and Electrical works, detail given below.
Supply and fixing of 2½” Pump Nipple G.I. new making with flange | 2 | Each | 2,500 ₹5,000 | 1,500 ₹3,000 Lowest | 1,500 ₹3,000 Lowest |
| 2.00 | Supply and fixing of 2½” MS Clamp HD | 2 | Each | 2,000 ₹4,000 | 1,000 ₹2,000 Lowest | 1,000 ₹2,000 Lowest |
| 3.00 | Supply and fixing of Panel box Hut | 2 | Each | 9,500 ₹19,000 | 8,000 ₹16,000 Lowest | 8,000 ₹16,000 Lowest |
| 4.00 | Labour charge for making tee connection with existing line excavation, cutting, jointing and making and making connection with existing line complete in all respects | 2 | Each | 8,000 ₹16,000 | 2,500 ₹5,000 Lowest | 2,500 ₹5,000 Lowest |
| 5.00 | cost of connection charges for 1 Nos. Electric Connection to be deposit with DHBVN (load 10 HP 8 N kw) (Security, Meter Cost, Meter testing, 25mm square x3 core aluminum cable etc. complete), | 2 | Each | 95,000 ₹1,90,000 | 45,000 ₹90,000 Lowest | 45,000 ₹90,000 Lowest |
| 6.00 | Supply Submersible Motor pump KSB make 7.5HP 10 Stage | 2 | Set | 65,000 ₹1,30,000 | 41,000 ₹82,000 Lowest | 41,000 ₹82,000 Lowest |
| 7.00 | Supply and Fixing GI Pipe 2.5 inch Horizontal both side flange fitted length as per site requirement | 2 | Each | 5,000 ₹10,000 | 1,500 ₹3,000 Lowest | 1,800 ₹3,600 |
| 8.00 | Supply and Fixing GI Pipe 2.5 inch Vertical both side flange fitted length as per site requirement | 2 | Each | 5,000 ₹10,000 | 1,500 ₹3,000 Lowest | 1,800 ₹3,600 |
| 9.00 | Supply and fixing of DI Tee 3”x3”x3” D/D | 2 | Each | 2,800 ₹5,600 | 1,500 ₹3,000 Lowest | 1,800 ₹3,600 |
| 10.00 | Supply of D.I Duck foot Bend D.I duck foot bend 3” D/F | 2 | Each | 2,600 ₹5,200 | 1,500 ₹3,000 Lowest | 1,800 ₹3,600 |
Tender Value
₹13.2 L
EMD Value
₹26,400
Closing Date
2 Oct 2025, 6:55 pmClosed
NITIN KADIAN
Municipal Corporation Faridabad
Provision 2 Nos. New Tube-wells bore by DTH Machine at Sector-21D, Block-E and Block-F SGM Nagar in Ward No.17 (New), Faridabad.
2025_HRY_474631_1
2025776FDC8D F7C0 4370 8A08 8E3C139B8133284ULB
Open Tender
Civil Works
Works
90 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,000
₹26,400
Yes
17 Nov 2025
25 Sept 2025
3 Oct 2025
25 Sept 2025
2 Oct 2025
25 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .