| 1.00Name of Work: Construction of Drainage with cover slab and Horizontal Soak pit at Padmanabamangalam Yadavar street in Padmanabamangalam village panchayat (65 m) Srivaikundam Panchayat Union Thoothukudi district | |||||
| 2.00 | Earthwork excavation ina all clauses of soil with initial lead of 10m and initial lift 2m except hard rock blasting etc compelete as per std specification | 75.56 | cum | 263 ₹19,872.28 | 270 ₹20,401.20 |
| 3.00 | CC1:4:8 mix using 40mm ISS HBG Metal including cost and conveyence of all materials to site all labour charges | 23.17 | cum | 5,271 ₹1.2 L | 5,280 ₹1.2 L |
| 4.00 | CC1:2:4 mix using 20mm ISS HBG Metal including cost and conveyenc of all material to site and all labour charges | 52.33 | cum | 6,568 ₹3.4 L | 6,570 ₹3.4 L |
| 5.00 | Supplying and erecting centering shuttering including nessery supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam | 308 | SQM | 547 ₹1.7 L | 550 ₹1.7 L |
| 6.00 | Supplying and fabrication of steel including cost and conveyence and all labour charges etc | 0.16 | MT | 91,890 ₹14,518.62 | 91,900 ₹14,520.20 |
| 7.00 | RCC1:1:5:3 mix using 20mm ISS HBG Metal including cost and conveyence of materials labour charges | 2.76 | cum | 9,000 ₹24,840 | 9,010 ₹24,867.60 |
| 8.00 | Plastering with cm 1:5 12mm thick including cost and conveyence and all labour charges | 29.25 | SQM | 280 ₹8,190 | 290 ₹8,482.50 |
| 9.00Sub Estimate - Horizontal Soak pit | |||||
| 10.00 | Earthwork excavation ina all clauses of soil with initial lead of 10m and initial lift 2m except hard rock blasting etc compelete as per std specification | 19.36 | cum | 260 ₹5,033.60 | 270 ₹5,227.20 |
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
12 Jan 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(VP)
BLOCK DEVELOPMENT OFFICER (VP) SRIVAIKUNDAM Panchayat Union Office,Srivaikundam Block,Thoothukudi District
Construction of Drainage with Cover slab and Horizontal soak pit at Padmanabamangalam yadhavar street in Padmanabamangalam village panchayat (65m) Srivaikundam Panchayat Union Thoothukudi district underthe Scheme of Mines and Minerals 2025-2026
2026_RDTN_638482_1
Lr.No. jp1/496/2025 Dt 31.12.2025
Open Tender
Civil Works
120 days
srivaikundam block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹9,800
27 Mar 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
Earthwork excavation ina all clauses of soil with initial lead of 10m and initial lift 2m except hard rock blasting etc compelete as per std specification
CC1:4:8 mix using 40mm ISS HBG Metal including cost and conveyence of all materials to site all labour charges
CC1:2:4 mix using 20mm ISS HBG Metal including cost and conveyenc of all material to site and all labour charges
Supplying and erecting centering shuttering including nessery supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam
Supplying and fabrication of steel including cost and conveyence and all labour charges etc
RCC1:1:5:3 mix using 20mm ISS HBG Metal including cost and conveyence of materials labour charges
Plastering with cm 1:5 12mm thick including cost and conveyence and all labour charges
Sub Estimate - Horizontal Soak pit
Earthwork excavation ina all clauses of soil with initial lead of 10m and initial lift 2m except hard rock blasting etc compelete as per std specification
CC1:4:8 mix using 40mm ISS HBG Metal including cost and conveyence of all materials to site all labour charges
CC1:3:6 mix using 20mm ISS HBG Metal including cost and conveyenc of all material to site and all labour charges
Plastering with cm 1:5 12mm thick including cost and conveyence and all labour charges
Supply and filling with 6mm HBG Metal including all cost and conveyence of materials labour charges
Supply and filling with 20mm HBG Metal including all cost and conveyence of materials labour charges
Supply and filling with 40mm HBG Metal including all cost and conveyence of materials labour charges
Supply and filling with M- Sand including all cost and conveyence of materials labour charges
Colour washing two coats using approved colour including all cost and conveyence of materials labour charges etc
Supply and fixing of PVCPipe 180mm dia for discharge water outlet including all cost and conveyence of materials
Supply and fixingof steel mesh including all cost and conveyence of materials labour charges such as curing etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_764141.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TechnicalBid.pdf
Tender Documents • 0.72 MB
BOQ_764141.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid