Loading…
Loading…
Tender Value
₹83.6 L
EMD Value
₹1.7 L
Closing Date
13 Oct 2026, 3:00 pm
Executive Engineer
Paryatan Bhavan Patto Panaji Goa
Reconstruction Of Existing Stage Room And Development Of Surrounding Area With Beautification And Illumination At Bhatwadi Headland Sada In Mormugao Constituency
2026_GTDCL_32113_1
GTDC/PC/EE-(S)/2026-27/e-65
Open Tender
Civil Works
Item Rate
180 days
4th floor Paryatan Bhavan Patto - Panaji - Goa
Please refer Tender documents.
12 documents required · 12 mandatory
₹8,000
₹1.7 L
30 Sept 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1CIVIL WORKS | ||||||
| 1.01 | Transport and Carriage of Materials (A) By tipper truck including loading, unloading and stacking (10km)( ii ) Earth | 130 | Cu.M | - | - | 18% |
| 1.02 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 2.6 | 100/Sq.M | - | - | 18% |
| 1.03 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed includingproviding barricading, danger lighting guarding as directed in : C) Hard rock where blasting prohibited | 143.78 | Cu.M | - | - | 18% |
| 1.04 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. A) All kind of Soil | 109 | Cu.M | - | - | 18% |
| 1.05 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 119 | Cu.M | - | - | 18% |
| 1.06 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 345 | Cu.M | - | - | 18% |
| 1.07 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level ( Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level ) | 24 | Cu.M | - | - | 18% |
| 1.08 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20mm nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level | 206 | Cu.M | - | - | 18% |
| 1.09 | Centering & shuttering including Strutting, Propping & removal of forms for : i) Foundations, Footings, Bases for Columns | 24 | Sq.M | - | - | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.34 MB
Tendernotice_3.pdf
PDF • 0.23 MB
Tendernotice_4.pdf
PDF • 0.24 MB
Tendernotice_5.pdf
PDF • 0.52 MB
Tendernotice_6.pdf
PDF • 2.81 MB
Tendernotice_7.pdf
PDF • 0.19 MB
Tendernotice_8.pdf
PDF • 0.13 MB
Tendernotice_9.pdf
PDF • 0.10 MB
BOQ_32501.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .