Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.5 L+₹84,591.46 (9.75%)Rejected-Finance C O ANISH KUMAR GOYAL PURENAH PARA ROAD WARD NO 5 SAKTI SAKTI CHHATTISGARH 495689 | JANJGIR CHAMPA | CHHATTISGARH | 495689 | L2 | Rejected-Finance HIGHER THEN L1 | |
| 3 | L3₹10.4 L+₹1.8 L (20.2%)Rejected-Finance | L3 | Rejected-Finance HIGHER THEN L1 |
Tender Value
₹11.0 L
EMD Value
₹22,000
Closing Date
28 Jun 2023, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Saprar Division, Jhansi
Construction of Boundary Wall at Rehuta Inspection House
2023_UPIDC_812810_1
01/EE/2023-24
Open Tender
Civil Works
Item Rate
45 days
Rehuta
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹22,000
24 Aug 2023
17 Jun 2023
28 Jun 2023
17 Jun 2023
28 Jun 2023
17 Jun 2023
Amount
Excavation in foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.50m. and lead upto 30m. and i/c filling, watering, raming of excavated earth into the trenches or upto the space and sides of the foundation trenches i/c cost of all material, labours, T&P etc. required for proper completion of the work.
Laying C.C. (1:3:6) with cement, C-Sand and crushed hard stone grit i/c cost of all material, labours, T&P etc. required for proper completion of the work.
Supply and fixing of Pre Cast Cement Concrete Readymade boundry wall including cost of All Material, Labour, T & P etc. and All lead & lift for proper completion of work. (RCC Post Size = 2.44×0.15×0.15 m) (RCC Plank Size = 1.83×0.30×0.05 m)
Centering & Shuttering for C.C./R.C.C. work i/c rent of shuttering material, labour and T&P required for proper completion of work.
Laying R.C.C.M-20(1:1.5:3) with cement, C-Sand and crushed hard stone grit i/c cost of all material, labours, T&P etc. required for proper completion of the work.
Fabrication of steel Gate (4.0x1.750Mtr) with Angle Iron & 12mm Squar Bar including cutting .driling .welding where necessary and fixing in positation including all cost of lead &etc.for proper completion of work . With one coat of red oxide primer . But excluding cost of cement concret fixing i/c cost of all material, labour, T&P etc.
Painting or Vernishing New Iron work in small area or new wood work with one coat (upto 1 sqm) of readymixed priming paint and two coat of approved superior quality radymixed paint or vernish including suppy of all matrial, labour and T&P etc. Required for proper complection of work.Pint too be used should confrom the ISI no- 103-1950
Finishing wall with two coat of water proof cement paint (Snowsam) of approved quality make such as super snowsam duroocem, robecem, supercem quality and of required shade on previously old treated surface with this paint to give an even shade after thoroughly brushing the surface to remove oil dirt and remaing loose pwdered material incluidng curing and cost of all materials, labour, T&P etc. required for proper completion of work.
Cutting,Bending, binding, & placing Reinforcement i/c cost of binding wire cost of steel, labour, T&P etc. required for proper completion of work.
M/S MAA SHARDA CONSTRUCTION AND SUPPLIERS
MEHERWAN CONSTRUCTION AND SUPPLIERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .