Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.1 LAccepted-Finance 18 SANKAR BOSE ROAD KOLKATA | L1 | Accepted-Finance L1 | |
| 2 | L2₹73.1 L+₹2,517 (0.03%)Rejected-Finance 17 1 SREEMANTA DEY LANE KOLKATA 700 012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹73.1 L+₹4,060 (0.06%)Rejected-Finance | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEBJYOTI BASU L3 | M S ENTERPRISE L1 | CHANDRA ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00PART-A Labour charges for 2 [two] Nos operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | ||||||
| 1.01 | Kalinagar Ganeshpur Augmentation W/S Scheme PH-1 | 365 | Days | 1,367.96 ₹4,99,305.4 | 1,367 ₹4,98,955 Lowest | 1,367.6 ₹4,99,174 |
| 1.02 | Kalinagar Ganeshpur Augmentation W/S Scheme PH-2 | 365 | Days | 1,367.96 ₹4,99,305.4 | 1,367 ₹4,98,955 Lowest | 1,367.6 ₹4,99,174 |
| 1.03 | Gobindarampur W/S Scheme PH-1 | 365 | Days | 1,367.96 ₹4,99,305.4 | 1,367 ₹4,98,955 Lowest | 1,367.6 ₹4,99,174 |
| 1.04 | Gobindarampur W/S Scheme PH-2 | 365 | Days | 1,367.96 ₹4,99,305.4 | 1,367 ₹4,98,955 Lowest | 1,367.6 ₹4,99,174 |
| 2.00Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | ||||||
| 2.01 | Kakdwip Akshyanagar Left out portion Part-A | 365 | Days | 683.98 ₹2,49,652.7 | 683.5 ₹2,49,477.5 Lowest | 683.8 ₹2,49,587 |
| 2.02 | Kakdwip Akshyanagar Left out portion Part-B | 365 | Days | 683.98 ₹2,49,652.7 | 683.5 ₹2,49,477.5 Lowest | 683.8 ₹2,49,587 |
| 2.03 | Kakdwip Akshyanagar Left out portion Part-C | 365 | Days | 683.98 ₹2,49,652.7 | 683.5 ₹2,49,477.5 Lowest | 683.8 ₹2,49,587 |
| 2.04 | Gobindarampur W/S Scheme PH-3 | 365 | Days | 683.98 ₹2,49,652.7 | 683.5 ₹2,49,477.5 Lowest | 683.8 ₹2,49,587 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
9 Sept 2026, 12:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
O and G of the electric operated pumping machinery at Kalinagar Ganeshpur Aug,Kakdwip Akshyanagar Left out portion, Gobindarampur, Nebutala Abad Mouza, Gangadharpur, Ramchandranagar, Ramtanunagar and Shibnagar W/SS of Kakdwip Block under SMD, PHE Dt
2026_PHED_5019630_1
WBPHE/EE/SMD/NIeT-09 of 2026-27 (2nd Call)
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Kakdwip Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.5 L
28 Sept 2026
22 Aug 2026
11 Sept 2026
22 Aug 2026
9 Sept 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A Labour charges for 2 [two] Nos operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | |||||
| 1.01 | Kalinagar Ganeshpur Augmentation W/S Scheme PH-1 | - | Days | - | - |
| 1.02 | Kalinagar Ganeshpur Augmentation W/S Scheme PH-2 | - | Days | - | - |
| 1.03 | Gobindarampur W/S Scheme PH-1 | - | Days | - | - |
| 1.04 | Gobindarampur W/S Scheme PH-2 | - | Days | - | - |
| 2Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | |||||
| 2.01 | Kakdwip Akshyanagar Left out portion Part-A | - | Days | - | - |
| 2.02 | Kakdwip Akshyanagar Left out portion Part-B | - | Days | - | - |
| 2.03 | Kakdwip Akshyanagar Left out portion Part-C | - | Days | - | - |
| 2.04 | Gobindarampur W/S Scheme PH-3 | - | Days | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.23 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_5092674.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .