| 1 | 1₹19.4 LAccepted-AOC | 1 | Accepted-AOC Below than estimate | |
| 2 | 2₹19.5 L+₹4,370.94 (0.22%)Rejected-AOC | 2 | Rejected-AOC Above than estimate |
| Sl No | Description | Qty | Unit | MUHIDEEN ABDUL KADHER CONTRACTOR L1 | SARAVANAKUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Part 1 :Construction of 30,000 Litre OHT at MGR Nagar near Anganwadi in Marambady panchayat Estimate Amount Rs.19.71 lakhs | |||||
| 2.00Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart | |||||
| 3.00 | First depth of 2m | 38.88 | Cum | 263.78 ₹10,255.77 Lowest | 285 ₹11,080.8 |
| 4.00 | Second depth of 1m | 6.78 | Cum | 263.78 ₹1,788.43 Lowest | 285 ₹1,932.3 |
| 5.00 | Sand filling for foundation with M. sand including cost of sand watering, ramming and consolidation etc complete | 2.09 | Cum | 1,872.43 ₹3,913.38 Lowest | 1,872.43 ₹3,913.38 Lowest |
| 6.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete | 3.6 | Cum | 5,537.25 ₹19,934.1 Lowest | 5,537.25 ₹19,934.1 Lowest |
| 7.00RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete | |||||
| 8.00 | For items 1.5m to 4.5m below GL | 6.31 | Cum | 9,413.55 ₹59,399.5 Lowest | 9,413.55 ₹59,399.5 Lowest |
| 9.00 | For items 0 to 1.50m below GL | 1.75 | Cum | 9,274.78 ₹16,230.87 Lowest | 9,274.78 ₹16,230.87 Lowest |
| 10.00 | For items 0m to 4.5m above GL | 2.83 | Cum | 9,415.85 ₹26,646.86 Lowest | 9,415.85 ₹26,646.86 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
13 Jan 2026, 5:00 pmClosed
Block Development Officer(BP)
Panchayat Union Office
Construction of 30,000 Litre OHT at MGR Nagar near Anganwadi in Marambady panchayat
2026_RDTN_641589_2
645/2025/A3
Open Tender
Civil Works - Buildings
Item Rate
Vedasandur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
18 Feb 2026
10 Jan 2026
13 Jan 2026
10 Jan 2026
13 Jan 2026
10 Jan 2026
Amount
Part 1 :Construction of 30,000 Litre OHT at MGR Nagar near Anganwadi in Marambady panchayat Estimate Amount Rs.19.71 lakhs
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
First depth of 2m
Second depth of 1m
Sand filling for foundation with M. sand including cost of sand watering, ramming and consolidation etc complete
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete
For items 1.5m to 4.5m below GL
For items 0 to 1.50m below GL
For items 0m to 4.5m above GL
For items 4.51m to 7.32m above GL
For items 7.32m to 10.98m above GL
For items 10.98m to 14.64m above GL
For items above 14.64m & up to 18.30m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES
ABOVE G.L. to 3.30m
Curved Surface
0 to 3.30m from floor level
Square column
Below G.L.
Ground level to 3.30 m
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes incluidng all materials and all labour charges
Providing cut stone slab in CM 1:3 incluidng all materials and all labour charges
Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edgesincluidng all materials and all labour charges
Pipe connection arrangements
50mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for over flow & 1xl Scour
50mm Ø GI pipes for Inlet pipe
50mm Ø GI pipe for Outlet
50mm Ø GI pipe for Delivery line
50mm Ø GI Tee
50mm Ø GI coupler
50mm Ø GI union
50mm Ø GI Elbow
50mm Ø GM gate valve
50mm Ø GI Flange set
Delivery line pipe connection
63mm PVC pipe 4KSC
63mm PVC MTA
Solvent oil
Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete
Pipe line
Labour charges for laying and lowering PVC Pipe and specials including all cost and conveyance of all materials and all labour charges etc complete
Pipe line
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
SARAVANAKUMAR CONTRACTOR (BID ID -1562666)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_768470.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .