Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
| 2 | Admitted-Finance NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | Admitted-Finance |
Tender Value
₹47.6 L
EMD Value
₹48,000
Closing Date
30 May 2022, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Strengthening of road 1 No in Package No TN 30-11 in Sendurai Block of Ariyalur District under TNRRIS 2021-22 (80 Percent CGF Priority)
2022_RDTN_232306_1
A3/5641/2021,Dated.12.05.2022
Open Tender
Civil Works - Roads
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹48,000
DRDA, Ariyalur
7 Jun 2022
14 May 2022
30 May 2022
14 May 2022
30 May 2022
14 May 2022
20 May 2022
Amount
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the old BT surface and Metal surface including all labour charges etc., complete
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60 Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80 Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.complete (PCSC with Paver)
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Dismantling and clearing away the any thickness of Reinforced cement conctrete including all labour charges etc., complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
Dismantling and clearing away the any thickness of Plain cement conctrete including all labour charges etc., complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Below Ground Level)
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Above Ground Level)
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Providing and fixing 6mm bitumen felt for expansion joint between dirtwall & deck slab
1.50m Span RCC Slab Culvert @ Ch 50m
1.50m Span RCC Slab Culvert @ Ch 280m
1.50m Span RCC Slab Culvert @ Ch 794m
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.
1.50m Span RCC Slab Culvert @ Ch 794m
Gravel filling between body wall including cost and conveyance of gravel labour charges for filling, watering, compacting etc., complete
1.50m Span RCC Slab Culvert @ Ch 794m
Providing weepholes in Brick masonry/stone masonry,/plain cement concrete /reinforced concrete for abutment including cost and conveyance of all labour charges etc complete
1.50m Span RCC Slab Culvert @ Ch 794m
Provision for KM Stone
Provision for HM Stone
Provision for Sign board
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Panneerselvam
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .