Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-Finance | L1 | Accepted-Finance that the bid is L1 | |
| 2 | L2₹11.9 L+₹1.1 L (10.5%)Rejected-Finance 3 C DR JAGABANDHU LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L2 | Rejected-Finance that the bid is not L1 | |
| 3 | L3₹13.2 L+₹2.5 L (23.5%)Rejected-Finance | L3 | Rejected-Finance that the bid is not L1 | |
| 4 | L4₹15.0 L+₹4.3 L (40.2%)Rejected-Finance MOSAT HARIPUR RD VILL P O HARIPUR DIST HOOGHLY PIN 712701 | HARIPUR | HOOGHLY | WEST BENGAL | 712701 | L4 | Rejected-Finance that the bid is not L1 | |
| 5 | L5₹15.1 L+₹4.4 L (40.9%)Rejected-Finance | L5 | Rejected-Finance that the bid is not L1 |
Tender Value
₹14.8 L
EMD Value
₹29,622
Closing Date
8 Jul 2026, 1:00 pmClosed
EEI,KNHED, PW Dte
THE EXECUTIVE ENGINEER, P.W.D /KOLKATA NORTH HEALTH ELECTRICAL DIVISION
Day to day routine and preventive maintenance of Electrical Installation at Sukanta Chatrabas under J.B.Roy State Ayurvedic MCH (F.Y.-2026-27)
2026_WBPWD_5015822_1
WBPWD/EE/KNHED/e-NIT-06/26-27
Open Tender
ELECTRICAL WORKS M/R
Percentage
365 days
Kolkata
Please refer Tender documents.
7 documents required · 7 mandatory
₹29,622
Office of the EE, KNHED,PW Dte
19 Aug 2026
22 Jun 2026
10 Jul 2026
22 Jun 2026
8 Jul 2026
26 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing daily 3 number semi-skilled, and 3 numbers unskilled labour manpower for maintenance of electrical Sub Station , Electrical installations of Entire campus (Existing & upcoming all EI ) , Both Non-Residential & Residential Bldg., Compound Light incl. Operation of All Diesel Generator Set in the Premises of Sukanta Chatrabas under J.B.Roy State Ayurvedic MC&H. The maintenance work should be carried out as per following scope of works and terms & conditions.
Semi Skilled Labour ( Including Reliver )
(For 3 Shift ) | 36 | Head / Per Month | 21,553 | ₹7,75,908 |
| 1.1 | Unskilled Labour ( Including Reliver )
(For 3 Shift ) | 36 | Head / Per Month | 19,589 | ₹7,05,204 |
| 2(Rates with all Taxes & Duties , PF, ESI, and Bonus & Profit) As per instruction of The CE(W) Electrical,South Bengal,HQ & Planning,PWD Vide Memo no.1734/CEWE/2025 Dt. 12.09.25the agency should follow all due process regarding ESI & PF. The Bill will not be drawn without submitting the ESI & PF Challan of the staffs working at site. The participating agency should upload signed Terms & Condition (vide Annexure-I) attached with NIQ. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
suspension.pdf
Other Document • 2.91 MB
BOQ_5084847.xls
BOQ • 0.30 MB
2911.pdf
Tender Documents • 1.46 MB
Annexure-I_Terms_Conditions.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .