Improvements, Desilting, Stregthening the pond 5 Nos in Package No.TN 30-02 in Ariyalur Block of Ariyalur District Under AGAMT II 2021-22
2022_RDTN_247442_1
R.C.No.A4/5304/2021, Date.10.08.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Ariyalur
As per tender documents
4 documents required · 4 mandatory
₹0
₹42,000
14 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
Amount
1.Improvements, Desilting, Strengthening the bund to Marriyammankulam in Eruthukaranpatti Panchayat @ Ariyalur Panchayat Union. scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machineryfor desilting channel having a width of more than 10mand forming bund on either sides and depositing the earthon banks including jungle clearance etc complete
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cost and supply of weepholes 90mm PVC pipe
Provision for Name board
2.Improvements, Desilting, Strengthening the bund to Kurumbankulam in Kadugur Panchayat @ Ariyalur Panchayat Union. scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machineryfor desilting channel having a width of more than 10mand forming bund on either sides and depositing the earthon banks including jungle clearance etc complete
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cost and supply of weepholes 90mm PVC pipe
Provision for Name board
3.Improvements, Desilting, Strengthening the bund Ayyanathur Ayyanarkulam i in Kadugur Panchayat @ Ariyalur Panchayat Union. scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Provision for Name board
4.Improvements, Desilting, Strengthening the bund Vallakuttai in Walajanagaram Panchayat @ Ariyalur Panchayat Union. scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machineryfor desilting channel having a width of more than 10mand forming bund on either sides and depositing the earthon banks including jungle clearance etc complete
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cost and supply of weepholes 90mm PVC pipe
Provision for Name board
5.Improvements, Desilting, Strengthening the bund to Rajivnagar vannankuttai in Walajanagaram Panchayat @ Ariyalur Panchayat Union. scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blastingand conveying for formation of bund with lead of 0 to 100metre deploying earth moving machinery and tippersincluding benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machineryfor desilting channel having a width of more than 10mand forming bund on either sides and depositing the earthon banks including jungle clearance etc complete
Earth work excavation deploying earth moving machineryfor desilting channel having a width of more than 10mand forming bund on either sides and depositing the earthon banks including jungle clearance etc complete
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cost and supply of weepholes 90mm PVC pipe
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Panneerselvam
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .