Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrQualified 20 B UCHHAB BHAWAN BEDLA ROAD FATEHPUR UDAIPUR 313004 | UDAIPUR | RAJASTHAN | 313004 | ₹6.4 Cr | L1 | Qualified MII |
Tender Value
₹6.9 Cr
EMD Value
₹13.7 L
Closing Date
27 Nov 2023, 11:00 amClosed
SUPPLY OF Water Sprinkler 28KL WITH 4 YEARS SPARES
5458332
GEM/2023/B/4083225
Two Packet Bid
Water Sprinkler 28KL cap. mounted on 35T Dumper,Water Sprinkler 28KL cap. mounted on 35T Dumper,1st
120 days
Maharashtra; Nagpur, Maharashtra; Chhindwara
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
₹13.7 L
4 Dec 2023
4 Nov 2023
27 Nov 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Water Sprinkler 28KL cap. mounted on 35T Dumper | Design, manufacture, testing, delivery, on-site erection and commissioning of Diesel powered, self-propelled, wheeled Water Sprinkler of not less than 28KL capacity mounted on 35T off the highwayrear dumper chassis complete in all respects. | 1 | pieces | Abhimanuekatoch | 120 |
| 2 | Water Sprinkler 28KL cap. mounted on 35T Dumper | Design, manufacture, testing, delivery, on-site erection and commissioning of Diesel powered, self-propelled, wheeled Water Sprinkler of not less than 28KL capacity mounted on 35T off the highwayrear dumper chassis complete in all respects. | 1 | pieces | [email protected] | 120 |
| 3 | 1st Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for initial 12 months of operation the equiment during the warranty period from the date of commissioning of Equipment During Guarantee Period | 1 | pieces | Abhimanuekatoch | 120 |
| 4 | 1st Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for initial 12 months of operation the equiment during the warranty period from the date of commissioning of Equipment During Guarantee Period | 1 | pieces | [email protected] | 120 |
| 5 | 2nd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 2nd Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | Abhimanuekatoch | 850 |
| 6 | 2nd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 2nd Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | [email protected] | 850 |
| 7 | 3rd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 3rd Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | Abhimanuekatoch | 1215 |
| 8 | 3rd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 3rd Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | [email protected] | 1215 |
| 9 | 4th Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 4th Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | Abhimanuekatoch | 1580 |
| 10 | 4th Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 4th Year operation the equiment from the date of commissioning of Equipment | 1 | pieces | [email protected] | 1580 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5458332.pdf
GEM_BID
nit_2023-10-13-11-13-40_c35aa3adee08b0ef4103c47bd8bcb632.pdf
BOQ
boq_2023-10-13-11-13-40_ebca2eb921361b2ee34ac14066a01845.csv
BOQ
1697176035.xlsx
OTHER
IP_Format_24787e9a-4da4-4b7b-a0a51697176337436_sachin.khodke.pdf
OTHER
ATCW_6002f151-0e8b-4d6c-98221699077435099_sachin.khodke.doc
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid