Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹1.3 L
Closing Date
29 Sept 2026, 11:00 am7d left
Staff Officer Civil
GM Office, Jayant Project, Singrauli
Shifting of weigh bridge number 7 and 8 to another location near spur siding at jayant project
2026_NCL_365405_1
JNT/CED/26-27/19 dated 12.09.2026
Open Tender
Civil Works - Others
Percentage
120 days
Jayant Project
Please refer Tender documents
5 documents required · 5 mandatory
₹1.3 L
12 Sept 2026
12 Sept 2026
30 Sept 2026
12 Sept 2026
29 Sept 2026
14 Sept 2026
14 Sept 2026 - 23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | 2,000 | sqm | 18.7 | ₹37,400 |
| 2 | "Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of soil" | 444 | cum | 152.2 | ₹67,576.8 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 50 | cum | 5,402.95 | ₹2,70,147.5 |
| 4 | "Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)." | 220 | cum | 6,908.3 | ₹15,19,826 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 8,482.4 | ₹16,964.8 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts | 198 | sqm | 544.6 | ₹1,07,830.8 |
| 7 | "Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. " | 624 | sqm | 479.6 | ₹2,99,270.4 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 22,200 | Kg | 101.25 | ₹22,47,750 |
| 9 | "Brick work with FALG bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)" | 20 | cum | 5,193.8 | ₹1,03,876 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_378334.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .