Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | ₹13.3 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹13.9 LRejected-Finance | ₹13.9 L | L2 | Rejected-Finance Dis Qualified |
| Sl No | Description | Qty | Unit | VISWANATHAN L2 | M/S. KVB TREADERS L1 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Road & Drainage @ Odappai Palla Street in Odappai Panchayat In Poondi Block | |||||
| 2.00 | DRAINAGE : Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation. | 59 | cum | 135 ₹7,965 | 120 ₹7,080 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance and all labour charges | 11.8 | cum | 5,670 ₹66,906 | 5,510 ₹65,018 |
| 4.00 | Cement concrete 1 : 3 : 6 mix using20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete | 27.14 | cum | 6,400 ₹1.7 L | 6,200 ₹1.7 L |
| 5.00 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete | 236 | sqm | 370 ₹87,320 | 365 ₹86,140 |
| 6.00 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 35.4 | cum | 550 ₹19,470 | 540 ₹19,116 |
| 7.00 | CC ROAD : Earth Work Excavation depositing on Bank with initial lead and lift etc complete as per SS 20B | 15.72 | cum | 140 ₹2,200.80 | 130 ₹2,043.60 |
| 8.00 | Cement Conctrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 67.93 | cum | 5,670 ₹3.9 L | 5,510 ₹3.7 L |
| 9.00 | Centring charges for C.C Work | 133.3 | sqm | 140 ₹18,662 | 120 ₹15,996 |
| 10.00 | Cement Conctrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 12.05 | cum | 6,400 ₹77,120 | 6,200 ₹74,710 |
Tender Value
₹14.3 L
EMD Value
₹14,500
Closing Date
10 Mar 2026, 3:00 pmClosed
BDO (VP) POONDI
BDO OFFICE POONDI
Providing Cement Concrete Road and Drainage at Odappai Palla Street in Odappai Panchayat in Poondi Block Under Surplus Fund 2025-26
2026_RDTN_672402_1
1120/2025/A6
Open Tender
Civil Works
180 days
BDO OFFICE POONDI
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹14,500
Yes
13 Apr 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
Providing Cement Concrete Road & Drainage @ Odappai Palla Street in Odappai Panchayat In Poondi Block
DRAINAGE : Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance and all labour charges
Cement concrete 1 : 3 : 6 mix using20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
CC ROAD : Earth Work Excavation depositing on Bank with initial lead and lift etc complete as per SS 20B
Cement Conctrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Centring charges for C.C Work
Cement Conctrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement Conctrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply of Bitumen pads.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_808097.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Price_Bid_Surplusfund_CCDRAINAGE_Oddapai_2025-26_PND_01.pdf
Tender Documents • 0.38 MB
Techinical_Bid_Surplusfund_CCDRAINAGE_Oddapai_2025-26_PND_01.pdf
Tender Documents • 0.66 MB
BOQ_808097.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid