Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.2 L+₹66,971.61 (3.81%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.0 L
EMD Value
₹44,060
Closing Date
19 Sept 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Restoration of Damaged Compound Walling of Directorate of FCS and CA Kashmir.
2026_HAUDD_324535_1
ENIT/72/CRD/SMC/DT.14-09-2026
Open Tender
Civil Works
Percentage
30 days
CITY ROADS SMC
REFER TENDER DOCS
2 documents required · 2 mandatory
₹800
MUNICIPAL ACCOUNT
₹44,060
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 20 | No. | 20 | ₹400 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material beyond SMC limits including all its leads, lifts, loading, unloading, head load (if any) costs and carriages complete. (In cement mortar). | 104.5 | Cum | 1,458.45 | ₹1,52,408.03 |
| 3 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material including all its leads, lifts, loading, unloading, head load (if any) costs and carriages complete. (In cement mortar). | 43.92 | Cum | 1,740.45 | ₹76,440.56 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) complete. | 133.35 | Cum | 7,571.55 | ₹10,09,666.19 |
| 5 | Extra for dismantling, cleaning and reusing serviceable bricks in 1:6 cement mortar, including labour charges only, complete in all respects. | 30.77 | Cum | 2,000 | ₹61,540 |
| 6 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) all inclusive leads, lifts, loading, unloading, head load (if any) costs and carraiges complete. | 13.91 | Cum | 7,500 | ₹1,04,325 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including all costs and carriages complete. | 1,667.36 | Kgs | 123.2 | ₹2,05,418.75 |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,860 | Kgs | 120.8 | ₹2,24,688 |
| 9 | Providing and fixing steel barbed, nail-shaped wire of approved brand and manufacture, including all necessary labour, cutting, fixing complete in all respects as DOEIC. | 2,452 | RM | 19.85 | ₹48,672.2 |
| 10 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) including all leads, lifts, loading, unloading, head (if any) costs and carriages complete. | 41.61 | Cum | 7,677.35 | ₹3,19,454.53 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1094845.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .