| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC SASANG LATEHAR | LATEHAR | LATEHAR | JHARKHAND | ₹15.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.3 LRejected-Finance | ₹16.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹17.4 LRejected-Finance LATEHAR | ₹17.4 L | L3 | Rejected-Finance L3 |
Tender Value
₹17.6 L
EMD Value
₹35,500
Closing Date
27 Apr 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
Renovation of Toilet and Waiting Hall At D.R.D.A Building , Collectorate latehar. Dist-Latehar
2026_RDSPL_112074_6
EE/RDSD/LATEHAR/56/2025-26
Open Tender
Civil Works
75 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹35,500
Yes
14 May 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in excavation in foundation trenches in hard soil (vide classification of soil item-A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, all complete as per approved design, specification and direction of E/I. | - | M3 | - | - | BI01010001010000000000000515BI0100001113 | |
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, royaly and taxes all complete as per building specification and direction of E/l. | - | M3 | - | - | BI01010001010000000000000515BI0100001114 | |
Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. | 1 | M2 | - | - | BI01010001010000000000000515BI0100001115 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All wrk up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | M3 | - | - | BI01010001010000000000000515BI0100001116 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | - | M3 | - | - | BI01010001010000000000000515BI0100001117 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | M3 | - | - | BI01010001010000000000000515BI0100001118 | |
Providiag designation 75B brick work in Cement Mortar (1:6) in foudation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | - | M3 | - | - | BI01010001010000000000000515BI0100001119 | |
Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | 1 | M3 | - | - | BI01010001010000000000000515BI0100001120 | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
In Lintel | 1 | M3 | - | - | BI01010001010000000000000515BI0100001121 | |
Supplying, fitting and fixing good quality, well dressed and well seasoned sal wood work in chaukhat in doors, windows skylights, fanlights and C/W celetial windows openings, including wedge over all clamps complete including application of two coats of wood preservative of approved quality on the surface butting walls and lintels all complete as per building specification and direction of E/I. | 1 | M3 | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Sbd_2.pdf
Tender Documents • 1.00 MB
BOQ_152801.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid