| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 CrAccepted-Finance | ₹3.7 Cr | 1 | Accepted-Finance ACCEPTED as only Single BID Participated in 3rd call also |
Tender Value
₹3.7 Cr
Closing Date
31 Aug 2021, 3:00 pmClosed
Project Manager, Hyderabad Unit
office of Project Manager, Hyderabad Unit, Hyderabad
Additional MEP works with respect to the work of ESIC Hospital at Nacharam, Hyderabad.
2021_UPRNN_613265_1
333/UPRNN/E-Proc/21
Open Tender
Electrical Works
Item Rate
120 days
Nacharam, Hyderabad
As per NIT Document
3 documents required · 3 mandatory
₹5,900
UTTAR PRADESH RAJKIYA NIRMAN NIGAM LIMITED
Exempted
9 Sept 2021
24 Aug 2021
31 Aug 2021
24 Aug 2021
31 Aug 2021
24 Aug 2021
24 Aug 2021 - 31 Aug 2021
Amount
Providing & Fixing 315Kw Danfoss IP54 VFD module with required controls including repairs ,testing etc. as required
Providing and fixing Control box (Unit +compressor+12"HMI door mounted type) including and testing as required
Supplying and fixing of oil cooler solenoid valve including ,connections and testing as requrired
Supplying and fixing of Liquid injection solenoid valve including and testing as requrired
Supplying and fixing of Electronic expansion valve including testing as requrired
Supplying and fixing of DP switch including connections and testing as requrired
Charges for replacement of spares and re-commissioning of all chillers
Removing and refilling of chiller compressor lubricant oils as required
Repairing of sump heater to oil reservoir
Repairing of Main PCC, MCC Panel including all VFD as specified in the BOQ including replacement deffective spares , testing etc. as required
Repairing of VFD system for Panel of cooling Tower including replacement deffective spares , testing etc. as required. (15 KW VFD Nos)
Repairing of Main PCC, MCC Panel I Academic Block including replacement deffective spares , testing etc. as required
Repairing of PCC Panel in Hostel Block including replacement deffective spares , testing etc. as required
Repairing of Various UG sump panels , L+P Panels UPS Panels and Floor Panels including replacement of deffective Spares ,testing etc. as required
Repairingof deffective KEL make hot water Generators including replacement of deffective parts , testing etc. as required.
Supply , Installation , Tesing and commissioning of RIELLO make 120 KVA UPS System Model MPT 250 , High perfomance Hospital grade UPS, fully digital and micro processor controlled with inbuilt Galvanic Isolation transformer. Asa required . UPS make : RIELLO , Model MPT 120
Supply ,Installation , Testing and commissioning of Paralleling kit /Synchronizing kit as required ( this ir required for synchronizing or paralleling and not required forstandalone system )
Removing and replacement of bearings , seals as required for all hvac pumps
Condensor pumps(Head-27.5m,8316 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
Primary pumps(Head-14m,4990 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
secondary pumps
Hospital block 12hrs(Head-20m,2245 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
Hospital block 24hrs(Head-22m,3062 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
Academic block(Head-22m,3697 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
Hostel block(Head-20m,544 lpm)
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
HOT water pumps
Testing and fault identification
replacing of bearings
replacing of seal
Alignment of pump
Testing of all motors for water ingress. Repair winding, removing and replacement of bearings and making good of motors
Condensor pumps(Head-27.5m,8316 lpm,75hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
Primary pumps(Head-14m,4990 lpm,25hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
secondary pumps
Hospital block 12hrs(Head-20m,2245 lpm,15hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
Hospital block 24hrs(Head-22m,3062 lpm,25hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
Academic block(Head-22m,3697 lpm,30hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
Hostel block(Head-20m,544 lpm,5hp)
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
HOT water pumps
Testing and fault identification
replacing of bearings
repairing of winding
assembling of motor
Vaccum degasser, air and dirt separetor
Cable harness for interconnection of chiller equipment
240 sq mm flexible copper cable
AIR Washer
AWS/1 - 30,000 CFM, 1 x 1000 mm Fan, 1 x 20 HP Fan Motor, 50 mm St. Pressure, Suitable HP Water Circulation Monoblock Pump
Control cabling (PVC insulated Copper conductor
of 1.1 KV Grade armoured cable)
i) 3C x 1.5 Sq. mm
ii) 4C x 1.5 Sq. mm
iii) 5C x 1.5 Sq. mm
Elevators
inspection,Repair and replacing of required parts like hall control unit, door sensors, limit switches, control cabl, rollers, guides etc and amking them operational of the elevators submerged in water at basement level
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .