Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC CHATAI SHEEP WARD NO 07 NEW MARKET ROAD AHIWARA DURG CHHATTISGARH 490036 | DURG | CHHATTISGARH | 490036 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹23.2 L+₹2.7 L (13.1%)Rejected-AOC | L2 | Rejected-AOC ok | |
| 3 | L3₹23.8 L+₹3.3 L (16.2%)Rejected-AOC 9 NAROTTAM KUNJ MADHU NAGAR AGRA CANTT 282001 | AGRA | UTTAR PRADESH | 282001 | L3 | Rejected-AOC ok | |
| 4 | L4₹24.4 L+₹3.9 L (18.9%)Rejected-AOC 197 C P COLONY MORAR GWALIOR GWALIOR MADHYA PRADESH 474006 | GWALIOR | MADHYA PRADESH | 474006 | L4 | Rejected-AOC ok | |
| 5 | L5₹24.6 L+₹4.1 L (20.0%)Rejected-AOC 840 1B MADHUR VIHAR COLONY CIVIL LINES JHANSI UP 284 001 | JHANSI | JHANSI | UTTAR PRADESH | 284001 | L5 | Rejected-AOC ok |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
10 Dec 2020, 6:00 pmClosed
Garrison Engineer Gwalior
Garrison Engineer Morar Cantt Gwalior
8627/GWL/E8 OUTSOURCING THE RESOURCES FOR OPERATION OF THE LIFT 03 NOS INSTALLED AT NEW MH GWALIOR UNDER GE GWALIOR
2020_MES_397160_1
8627/GWL/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
Garrison Engineer Gwalior
As per tender documents
9 documents required · 9 mandatory
₹500
Garrison Engineer
₹48,000
Yes
22 Dec 2020
21 Nov 2020
12 Dec 2020
21 Nov 2020
10 Dec 2020
4 Dec 2020
Amount
Out sourcing to operate the electrically operated pasanger lift round the clock (i.e. 24 Hours in three shifts, each shift of 8 hours i.e Ist shift from 0600 Hours to 1400 hours, 2nd shift 1400 hours to 2200 hours and 3rd Shift 2200 hours to 0600 hours) by employing one FGM per shift for LIFT (15 Passangers) at New MH Gwalior complete all as specified and directed by Engr-in- Charge.
Out sourcing to operate the electrically operated pasanger lift in two shifts (i.e 1 st shift from 0600 Hours to 1400 hours and 2nd shift 1400 hours to 2200) by employing one FGM per shift for LIFT (13 Passangers) at New MH Gwalior complete all as specified and directed by Engr-in- Charge.
Out sourcing to operate the electrically operated pasanger lift in two shifts (i.e 1 st shift from 0600 Hours to 1400 hours and 2nd shift 1400 hours to 2200) by employing one FGM per shift for LIFT (13 Passangers) at New MH Gwalior complete all as specified and directed by Engr-in- Charge. NOTE :- Quoted rates deemed to be inclusive for the following :- (a) Lift should be kept neat and clean. (b) Daily check as per manufacturets manual before starting the machine (c) Any abnormality observed be immediately intimated to the JE E/M. (d) Min reqd tools to be always available with the operator and will be provided by contractor. (e) The Operater should have the minium knowldege of rescue people when get stroke inside the lift. (f) First aid box including medicines shall be kept in the installation and will be provided by the contractor. (g) Cost of uniform as approved by the Engr-in-Chrage/GE and operators shall always be in proper uniform. (j) Max duty hours of one operator will not be increase by more than 08 hours in any case.
M/s Pal Construction
M/s SCHOLASTIC ENTERPRISES
lodhi builders
M/S Kumar Contractors
DURGAI ELECTRICALS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .