Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 LAccepted-AOC BILASPUR | L-1 | Accepted-AOC Bidder has been placed L-1 | |
| 2 | L-2₹4.1 L+₹2,633.06 (0.65%)Rejected-Finance | L-2 | Rejected-Finance The bidder is replaced L2 and hence not qualified for Bid | |
| 3 | L-3₹4.1 L+₹5,722.89 (1.41%)Rejected-Finance SHED NO 9 TAHLIWAL DISTT UNA H P | L-3 | Rejected-Finance The bidder is replaced L3 and hence not qualified for Bid | |
| 4 | L-4₹4.7 L+₹63,300.99 (15.6%)Rejected-Finance | L-4 | Rejected-Finance The bidder is replaced L4 and hence not qualified for Bid | |
| 5 | L-5₹5.2 L+₹1.1 L (27.9%)Rejected-Finance | L-5 | Rejected-Finance The bidder is replaced L5 and hence not qualified for Bid |
Tender Value
Refer Docs
EMD Value
₹4,780
Closing Date
3 Jan 2022, 5:00 pmClosed
SE
(OP) Circle, HPSEBL, Una
Tender for SOP to 10 KW load connection to Reliance Tower Shitla and 11/0.4 KV 25 KVA to 63 KVA Sub Station Masthed Basti under ESD, HPSEBL, Bharwain
2021_HPSEB_55095_1
OCU-08/2021-22
Open Tender
Electrical Works
Item Rate
60 days
Bharwain
Please refer tender document
3 documents required · 3 mandatory
₹590
₹4,780
31 Jan 2022
28 Dec 2021
4 Jan 2022
28 Dec 2021
3 Jan 2022
28 Dec 2021
Amount
ERECTION PART 3-Ph L.T. Line
Errection of LT line. Digging of pit, errection of S.T. pole 8 mtr.long, errection of X-arm & Drilling of holes in X-arms, Painting of Pole, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Errection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor of New 3-Ph. New L.T Line = 0.620 Kms, 1-Ph to 3-Ph = 0.370 Km.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Erection Part of Aug. of 25 KVA to 63 KVA Sub-Station
Errection of linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F prov. earthing conn. to G.O Switch transformer lightning arrestor, Re-earthing of DTR, erection of LT cable, brabed wire and re-painting of steel pole etc. as per site Engineer driection complete in all respect. (25 to 63 KVA S/Stn.)
Supply Part of 3-Ph LT Line
Steel Tubular Poles 8 mtr Long
AAAC 7/3.15 sq mm conductor (55 mm2) (Eq. to Rabbit)
RCC Muff with concerete filling
Earth hook.
M.S.A.I X-Arm 75*75*6 mm length (1.50 Mtr + 0.02 mtr.)
Shackle Insulator with 16 Kn M.S D-Iron (U-Clamp)
Half clamps (M.S. flate 50*6 mm)
Full clamps (M.S. flate 50*6 mm)
LT Stay Set complete in all respect
LT Stay Wire (7/3.15 mm) (6 Kg Per Stay Set)
Nut & Bolt off sizes.
Spiral PVC Spacer
G.I. Wire 8 SWG
LT Earthing Set complete in all respect
Aluminium Paint
Supply Part of Aug. of 25 KVA to 63 KVA Sub-Station
Prov. 11/0.4 KV -63 KVA Transformer
Prov. LT Cable 3-1/2 core 95 mm^2 (Incoming)
Prov. LT Cable 3-1/2 core 70 mm^2 (Outgoing) for 3 nos. Out-Going Feeder
Prov. LT Distribution Panel Box 63 kVA DTR with MCCB (100 A, 10 KA, 4 P, 1 No) & SFU (32 A 4 No. rewirable)
Prov. Almunium Thimbles
Prov. Thimbles
Energy meter (3-phase 4 wire ) DLMS Complaint 100/5 A CT Type for 63 KVA D.TR
Lath Electrical Works
Pawan Kumar Sharma Govt. Contractor
M/S Raizada Enterprises
M/s Madan Lal Govt. Cont.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .