| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹7.6 L+₹728.63 (0.10%)Rejected-Finance | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | Vanniyanathan L2 | Balachandar L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 73.18 | Cum | 265 ₹19,392.7 | 262 ₹19,173.16 Lowest |
| 2.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 6.1 | Cum | 2,206.5 ₹13,459.65 | 2,206 ₹13,456.6 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including Cost and Conveyance of all materials to site and all labour charges etc.completed. | 6.1 | Cum | 6,001.5 ₹36,609.15 | 6,001 ₹36,606.1 Lowest |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 40mm metal including Cost and Conveyance of all materials to site and all labour charges etc.completed. | 46.94 | Cum | 6,279.5 ₹2,94,759.73 | 6,279 ₹2,94,736.26 Lowest |
| 5.00 | Supplying and erection of Centering for Side and Soffits including Country wood planks including all labour charges etc.,completed works., | 161.66 | Sqm | 549 ₹88,751.34 | 547 ₹88,428.02 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including Cost and Conveyance of all materials to site and all labour charges etc.completed. | 8.65 | Cum | 9,761.5 ₹84,436.98 | 9,761 ₹84,432.65 Lowest |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. | 1 | MT | 92,000.8 ₹92,000.8 | 92,000 ₹92,000 Lowest |
| 8.00 | Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab | 2.77 | Sqm | 234.5 ₹649.57 | 234 ₹648.18 Lowest |
| 9.00 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | 20 | No | 193 ₹3,860 | 192 ₹3,840 Lowest |
| 10.00 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. | 9.34 | Cum | 438 ₹4,090.92 | 436 ₹4,072.24 Lowest |
Tender Value
₹7.7 L
EMD Value
₹8,000
Closing Date
25 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
Panchayat Union Keerapalayam
Construction of Slab Culvert at Radha Vaikkal Near Bus stand kandhakumaran in Kandhakumaran Panchayat
2026_RDTN_660744_1
A2/174/2026-SURPLUS FUND-2025-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
Panchayat Union Keerapalayam
as per Tender
3 documents required · 3 mandatory
₹0
₹8,000
Yes
Panchayat Union Keerapalayam
7 Apr 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
18 Feb 2026 - 18 Feb 2026
18 Feb 2026
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including Cost and Conveyance of all materials to site and all labour charges etc.completed.
Cement concrete 1 : 3 : 6 mix using 40mm metal including Cost and Conveyance of all materials to site and all labour charges etc.completed.
Supplying and erection of Centering for Side and Soffits including Country wood planks including all labour charges etc.,completed works.,
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including Cost and Conveyance of all materials to site and all labour charges etc.completed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_792799.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TENDERDOC.pdf
Tender Documents • 0.36 MB
BOQ_792799.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .