SUPERINTENDING ENGINEER, OMCII,
Office SUPERINTENDING ENGINEER, OMCII, 2X200MW ,BTPS, Obra
Operation of Gods cum passenger lift (capacity 2 Ton ) installed in boiler side of 5X200MW BTPS and VIP lift installed in TG hall
2023_RVUNL_840074_1
N-OBR////6000003200_00
Open Tender
Power/Energy Projects/Products
Fixed-rate
365 days
OBRA Thermal Power Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy. CAO CFA and BO BTPS ,OBRA
₹23,122
1 Feb 2024
21 Sept 2023
8 Nov 2023
21 Sept 2023
6 Nov 2023
21 Sept 2023
21 Sept 2023 - 6 Nov 2023
Amount
Operation of two nos. Goods-cum-passenger lift (2.0 ton capacity) installed in boiler sides of unit No.9th and 10th for 3×200MW, BTPS, Obra, in two shifts per day (from 06:00 hrs to 14:00 hrs and 14:00 hrs to 22:00 hrs Excluding Sunday and other holiday) by trained staff, No. of jobs per day= 04 nos (02 jobs per lift per day × 02 nos lift)
Operation of above lift beyond schedule time on extra basis (OT Hrs.). (i.e. between 22:00 hrs – 06:00 hrs)
Operation of Goods-cum-passenger lift (2.0 Ton capacity) installed in boiler side between unit no. 12 & 13 for 2×200 MW unis of BTPS, Obra, in two shifts per day (from 06:00 hrs to 14:00 hrs and 14:00 hrs to 22:00 hrs) by trained staff of contractor. No. of jobs per day=02 nos.
Operation of above lift beyond schedule time on extra basis.( i.e. between 22:00 hrs – 06:00 hrs)
Operation of VIP lift situated in TG hall 200MW, BTPS, Obra, Operation of lift is to be in 01 shift per day (time from 09:30 hrs to 17:30 hrs) by trained staff of contractor. (Excluding Sunday and other holiday), No. of jobs per day=01 job per day.
Operation of above lift beyond schedule time on extra basis (09:30 hrs to 17:30 hrs.).
Servicing of Window AC installed in Machine room of KONE make boiler side lift, 3×200MW/2×200MW
Gas charging in Window AC installed in Machine room of KONE make boiler side lift, 3×200MW/2×200MW
Replacement of Compressor of AC installed in Machine room of KONE make boiler side lift, 3×200MW and 2×200MW
M/s R.L.ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .