Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC 71 BALU BANKER COLONY DHORI BOKARO BOKARO JHARKHAND 825102 | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC L1 bidder is techno commercially qualified. | |
| 2 | L2₹16.8 L+₹23,801 (1.44%)Rejected-Finance AT OLD B D O OFFICE MAIN ROAD PHUSRO DIST BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance Bid not be opened as per NIT terms. | |
| 3 | L3₹17.0 L+₹51,052 (3.09%)Rejected-Finance MAIN ROAD PHUSRO DIST BOKARO | PHUSRO | BOKARO | JHARKHAND | L3 | Rejected-Finance Bid not be opened as per NIT terms. |
Tender Value
₹18.6 L
EMD Value
₹23,300
Closing Date
5 Dec 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EnM), Dhori
Office of the General Manager, Dhori, po-Dhori, Bokaro, pin-825102
A)Mechanical repairing of 250KW, 3.3KV, 1490RPM, Russian motor(B) 435HP, 3.3KV, 1490RPM, GEC make induction motor (C)160KW, 3.3KV, 1485RPM, Marathon make induction motor (D)360KW, 3.3KV, 1484RPM, Marathon make induction motor attached with 1000GPM
2024_CCL_321817_2
GM(D)/SO(EnM)/DA/24-25/47
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
AADOCM
please refer tender documents
2 documents required · 2 mandatory
₹23,300
1 Aug 2025
23 Nov 2024
6 Dec 2024
25 Nov 2024
5 Dec 2024
25 Nov 2024
25 Nov 2024 - 27 Nov 2024
Amount
Part-A
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size Both side shafd.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
End cover housing repairing by Cl electrode welding and machining as per bearing size.
Rotor and rotor shaft alignment checking on lathe machine and rectification & its alignment setting by cut machining and polishing by stone file & complete balance checking
cost of coil molding charge.
Repairing and setting of Both side terminal box and new making of its cover by iron sheet.
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Cost of super enamel copper wire
Cost of insulation material (30 % of sl.no.12)
labour cost(15% of sl.no. 12)
Less reussed value (60% of sl.no.12)
Part-B
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size.
Repairing and setting of terminal box and new making of its cover by iron sheet.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
End cover housing repairing by Cl electrode welding and machining and per bearing size.
Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor.
After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots.
cost of coil molding charge.
Rotor and rotor shaft alignment checking on lathe machine and rectification & its alignment setting by cut machining and polishing by stone file & complete balance checking
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
Cost of super enamel copper wire
Cost of insulation material ((30 % of sl.no.12)
labour cost (15% of sl.no. 12)
Less reussed value (60% of sl.no.12)
Part-C
Rotor and rotor shaft alignment checking on lathe machine and rectification & its alignment setting by cut machining and polishing by stone file & complete balance checking
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
End cover housing repairing by Cl electrode welding and machining and per bearing size.
cost of coil molding charge.
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size.
Repairing and setting of terminal box and new making of its cover by iron sheet.
Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor.
After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
Part-D
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size Both side shafd.
Repairing and setting of Both side terminal box and new making of its cover by iron sheet.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
End cover housing repairing by Cl electrode welding and machining as per bearing size.
Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor.
After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots.
Rotor and rotor shaft alignment checking on lathe machine and rectification & its alignment setting by cut machining and polishing by stone file & complete balance checking
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
Cost of super enamel copper wire
Cost of insulation material ((30 % of sl.no.12)
labour cost((15 % of sl.no.12)
Less reussed value ((60 % of sl.no.12)
Supervision , incidental & overhead expenses
Total impact of GST for the purpose of CTC
Balajee Traders (BID ID -1106283)
M/S SHREE TIRUPATI TRADERS (BID ID -1106287)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .