| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.5 LAccepted-AOC AT BIDYUT COLONY PO VIKRAMPUR FCI TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L1 | Accepted-AOC AWARDED BEING L1 | |
| 2 | L2₹62.5 L+₹95,018.89 (1.54%)Rejected-Finance AT AMALAPADA TALCHER DIST ANGUL ODISHA | TALCHER | ANGUL | ODISHA | 759107 | L2 | Rejected-Finance REJECTED NOT BEING L-1 | |
| 3 | L3₹62.6 L+₹1.1 L (1.80%)Rejected-Finance AT PO KARNAPUR VIA DERA TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | L3 | Rejected-Finance REJECTED NOT BEING L-1 | |
| 4 | L4₹64.3 L+₹2.8 L (4.50%)Rejected-Finance AT JAGANNATH MARKET ROOM NO 15 P O SOUTH BALANDA TALCHER ANGUL | TALCHER | ANGUL | ODISHA | 759116 | L4 | Rejected-Finance REJECTED NOT BEING L-1 | |
| 5 | L5₹66.2 L+₹4.6 L (7.51%)Rejected-Finance ANGUL ODISHA 759132 INDIA UDYAM OD 01 0005071 | ANUGUL | ODISHA | 759132 | L5 | Rejected-Finance REJECTED NOT BEING L-1 |
Tender Value
₹1.1 Cr
EMD Value
₹1.4 L
Closing Date
2 May 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL BHARATPUR AREA
STAFF OFFICER CIVIL BHARATPUR AREA N.S.NAGAR ANGUL ODISHA-759148
Renovation of substation building and switchyard at RLS of Bharatpur OCP,BA (Re Tender).
2025_MCL_334177_1
GM(BA)/SO(C)/e Tender/2025-26/41 Dt.16.04.2025
Open Tender
Civil Works - Buildings
Percentage
120 days
BHARATPUR OCP
AS PER NIT
5 documents required · 5 mandatory
₹1.4 L
8 Aug 2025
17 Apr 2025
5 May 2025
17 Apr 2025
2 May 2025
17 Apr 2025
17 Apr 2025 - 25 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 127.44 | cum | 216.05 | ₹27,533.41 |
| 2 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 445 | sqm | 19.1 | ₹8,499.5 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 48.32 | cum | 5,013.3 | ₹2,42,242.66 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 32.8 | cum | 6,777.45 | ₹2,22,300.36 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.58 | cum | 6,361.4 | ₹1,69,086.01 |
| 6 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural
sources). | 5.17 | cum | 7,811.8 | ₹40,387.01 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,037.9 | kg | 97.9 | ₹2,97,410.41 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. sqm | 264 | sqm | 537.9 | ₹1,42,005.6 |
| 9 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :
25 mm thick sqm | 116.73 | sqm | 1,480.5 | ₹1,72,818.77 |
| 10 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.Double charge vitrified tile polished finish of size of Tile 600 x 600 mm | 389.9 | sqm | 1,304.8 | ₹5,08,741.52 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
Tender Document • 2.29 MB
Tendernotice_2.pdf
Tender Document • 1.38 MB
BOQ_346418.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .