Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC AT PO KISHOREGANJ PATNA ANAND BAZAR TALCHER TOWN DIST ANGUL ODISHA 759107 | TALCHER TOWN | ANGUL | ODISHA | 759107 | ₹3.3 L Quoted ₹2.8 L | L1 | Accepted-AOC Being L1. |
| 2 | L2₹3.2 L+₹41,961.44 (15.1%)Rejected-Finance | ₹3.2 L+₹41,961.44 (15.1%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.4 L+₹57,155.74 (20.5%)Rejected-Finance | ₹3.4 L+₹57,155.74 (20.5%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹3.4 L+₹59,657.37 (21.4%)Rejected-Finance | ₹3.4 L+₹59,657.37 (21.4%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹3.6 L+₹81,832.06 (29.4%)Rejected-Finance | ₹3.6 L+₹81,832.06 (29.4%) | L5 | Rejected-Finance Being 5 |
Tender Value
₹4.7 L
EMD Value
₹5,900
Closing Date
5 Aug 2024, 5:00 pmClosed
SO (CIVIL), MCL, TALCHER AREA
O/O SO (CIVIL), MCL, TALCHER AREA.
Spraying of water for dust suppression and upkeeping of road from mandapal Ghat(sand mines) to Champapasi incline for a period of 04(four) months of Deulbera Colliry under Talcher Area.
2024_MCL_313115_1
MCL/GM(TA)/SO(C)/ e-Tender/24-25/10 dt 22.07.24
Open Tender
Civil Works - Others
Item Rate
120 days
Deulbera Colliery
As per NIT.
3 documents required · 3 mandatory
₹5,900
Yes
14 Nov 2024
24 Jul 2024
6 Aug 2024
25 Jul 2024
5 Aug 2024
25 Jul 2024
25 Jul 2024 - 29 Jul 2024
Amount
Spraying of water on sand Transportation Road for suppression of dust by mobile tanker having spraying arrangement, loading of water into tankers by pump or any other means by contractor’s own arrangement, from any source with all lead and lift including the hire charges of water tanker, pump, cost of diesel ,mobil ,repair and maintenance and wages of driver and helper etc. all complete(The details/specification of the work enclosed).
Upkeeping of concrete pavement/black topped roads excluding coal transport road by brooming and disposal of collected debris/waste at collection pit/dustbins or at specified locations within a lead of 50 metres including all tools and plants like spade, basket ,brooms with handle stick complete as per direction of Engineer-In-Charge.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
SUMITRA SAHU
CHANDAN KUMAR PRADHAN
M/S. NIRANJAN SAHOO
ALOK BHUTIA
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .