| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC 482 GALI NO 4 TULSI VIHAR AZAD NAGAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹4,664 (2.03%)Rejected-Finance 790 STREET NO 1 PATEL NAGAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.5 L+₹20,597 (8.96%)Rejected-Finance 1350 B SHYAM LAL BAGH NEAR NAND CINEMA HISAR 125001 | HISAR | HARYANA | 125001 | L3 | Rejected-Finance L3 |
Tender Value
₹2.7 L
EMD Value
₹5,339
Closing Date
12 Feb 2024, 5:00 pmClosed
PRAMESH Kumar
ED - Hisar
Special Repair of Electrical Installation ( 3 Phase Cable, MCB and MCCB) in Government Industrial Training Institute, Bhodia Khera in Distt. Fatehabad
2024_HRY_351490_1
2024C2A4F009 D2F9 41A1 9E67 F85E97213508666BAR
Open Tender
Electrical Works
Works
60 days
BHODIA KHERA
2 documents required · 2 mandatory
₹500
₹5,339
Yes
9 Mar 2024
6 Feb 2024
13 Feb 2024
6 Feb 2024
12 Feb 2024
6 Feb 2024
Amount
[23.22.1.11]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.11. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 200 to 250 amp, 25 KA
[23.22.1.7]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.7. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 400 Amp, 50 KA
[23.22.1.9]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.9. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 6 amp to 100 amp , 25 KA
[23.22.2.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 2.1. MCCB Enclosure made of Sheet Steel suitable for mounting MCCB of following ratings MCCB up to 125 A FP
[23.22.2.2]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 2.2. MCCB Enclosure made of Sheet Steel suitable for mounting MCCB of following ratings MCCB up to 250 A FP
[23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole
[23.22.5.8]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.8. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. MCBs FOUR POLE
[24.2.5.3]LT CABLE 5.3. Laying and fixing of cable on surface/ cable tray etc as required:- 50 Sq mm to 150 sqmm 2 to 4 Core
[24.2.8.6]LT CABLE 8.6. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 35 sqmm
[24.2.8.7]LT CABLE 8.7. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 50 sqmm
Supply of LT Power Ard. Cables of Aluminium Conductor complete with all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work. Make:- Grandlay/ RR Kabel/ KEI/ Polycab. 50 Sqmm 3.5 Core Ard. Cable
Supply of Under Ground LT Power Ard. Cables of Aluminium Conductor complete with all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work. Make:- Polycab/RR Kabel/ Grandlay/ KEI) 70 Sqmm 3.5 Core Ard. Cable
S/E of 150 W LED Flood light luminaries with high power LED )110 Lumens per Watt 5700 K with high luminous efficacy, protected IP-66 with internal 5 KV and external 10 KV including all petty material with labor for erection, complete in all respect of Engineer-in-Charge of the work. Make:- Philips/Wipro/Surya/ Crompton
Dhamija Power Constructions
pawan Kumar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .