SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
Work of shifting single pole/double pole/four pole/conductor and other electrical material of 33 KV and LT lines obstructing the road to another place is to be done through an external agency.
2025_PVVNL_1010033_2
70/2024-25/EDC-I/MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD CHARTHAWAL MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹42,600
18 Jun 2025
15 May 2025
22 May 2025
15 May 2025
22 May 2025
15 May 2025
Amount
33 KV LINE SHIFTING WORK The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
STP POLE 13Mtr.
ACSR DOG Conductor
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing ACSR DOG CONDUCTOR on the established electric poles installed as per RESPO norms.
Work of Fixing/Installing Single Pole of the STP Pole 13 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the STP Pole 13 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Four Pole of the STP Pole 13 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Number Plate on establishing 6 no. Four Pole/10 no. Double Pole/ 50 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Tying/Binding Danger Board on establishing 6 no. Four Pole /10 no. Double Pole/ 50 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Tying Barbed Wire on establishing 6 no. Four Pole/10 no. Double Pole/ 50 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Pole Painting (Aluminium Paint) on establishing 6 no. Four Pole/ 10 no. Double Pole/ 50 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Pole Painting (Red Oxide Paint) on establishing 6 no. Four Pole/ 10 no. Double Pole/ 50 no. Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of installation of Stay Set Complete with Concreting on established Four Pole / Double pole of Line at the site As per the RESPO standards.
Complete work of Pole concreting on established 6 no. Four Pole/ 10 no. Double Pole / 50 no. Single Pole at the site as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing completing with earthing road of established 10 no. Double Pole /Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Pole Guarding by installaing G.I.Wire and MS Angle on established pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of cutting and pruning the branches of trees standing between the 33 KV Line on shifting place/route.
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Supply of Packing piece and clamp for above with Nut & Bolts as per RESPO standards
Supply of F-Bracket as per RESPO standards
Supply of Earth wire Clamp with Nut & Bolts as per RESPO standards
Supply of Amour rod with ferules for DOG as per RESPO standards
Supply of Stone Pad 300x300x75 mm as per RESPO standards
Supply of Number Plate as per RESPO standards
Supply of Danger Board with Clamp as per RESPO standards
Supply of Barbed wire as per RESPO standards
Supply of Bolt Nut & Washer as per RESPO standards
Supply of Aluminium Paint as per RESPO standards
Supply of Red Oxide Paint as per RESPO standards
Supply of Aluminium Binding Wire as per RESPO standards
Supply of Clamp for Ms Angle as per RESPO standards
Supply of Clamp for Top Channel as per RESPO standards
Supply of PG Clamp for Dog as per RESPO standards
Supply of Aluminium Tape as per RESPO standards
Supply of Nut & Bolt as per RESPO standards
Supply of Clamp with Nut & Bolt as per RESPO standards
SUNDRIES ITEMS
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
ST Pole 13 Mtr. Old & Used
ACSR DOG Conductor Old & Used
Steel Scrap Old & Used
LT LINE SHIFTING WORK The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
PCC POLE 8.5Mtr.
STP POLE 11Mtr.
LT ABC 1x25+1x16 Sqmm
LT ABC 3x95+1x70+1x16 Sqmm
LT ABC 3x50+1x35+1x16 Sqmm
LT ABC 3x120+1x95+1x16 Sqmm
3 Phase LT Distribution Box
1 Phase LT Distribution Box
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of Laying/Installing LT ABC 1x25+1x16 Sqmm on the established electric poles & other material installed at the site as per RESPO norms.
Complete work of Laying/Installing LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles & other material installed at the site as per RESPO norms.
Complete work of Laying/Installing LT ABC 3x50+1x35+1x16 Sqmm on the established electric poles & other material installed at the site as per RESPO norms.
Complete work of Laying/Installing LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles & other material installed at the site as per RESPO norms.
Work of Fixing/Installing Single Pole of the PCC Pole 8.5 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Single Pole of the STP Pole 11 Mtr. installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel, Stone pad etc. and decentralized material will be provide by the Contractor/Firm.
Complete work of Pole concreting on established Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Installing and Commissioning 3 Phase LT Distribution Box as per RESPO standards.
Complete work of Installing and Commissioning 1 Phase LT Distribution Box as per RESPO standards.
Complete work of installation of Stay Set Complete with Concreting on established Single pole of Line at the site As per the RESPO standards.
Complete work of Earthing completing with earthing road of established Single Pole at the site as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Electric poles/Cable etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work.
Supply of Stone Pad 300x300x75 mm as per RESPO standards
Supply of Dead end Clamp as per RESPO standards
Supply of Suspension Clamp as per RESPO standards
Supply of J-Hook as per RESPO standards
Supply of Nut & Bolt as per RESPO standards
SUNDRIES ITEMS
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
ST Pole 13 Mtr.
ACSR DOG Conductor Old & Used
Steel Scrap
M/S Vikas Enterprises (BID ID -5206156)
M/S Rachna Enterprises (BID ID -5205460)
Divakar Enterprises (BID ID -5206319)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .