| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹38.0 L+₹23,395.67 (0.62%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹38.2 L
EMD Value
₹77,000
Closing Date
20 Feb 2023, 2:00 pmClosed
S. E. Irrigation Construction Circle, Varanasi
Superintending Engineer, Irrigation Construction Circle, Varanasi
Construction Of Boundary Wall Of Jauharganj Store and Colony In Tahsil Saidpur, District Ghazipur.
2023_UPIDC_767328_5
04/SE/2022-23
Open Tender
Civil Works
Item Rate
30 days
Jauharganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹77,000
2 Mar 2023
14 Feb 2023
20 Feb 2023
14 Feb 2023
20 Feb 2023
14 Feb 2023
Amount
E/W in excavation in foundation with all lead lift and all types of soil for wet earth including all cost of labour and T&P etc.
Centering and Shuttering for C.C. work with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Providing & Layaing C.C. 1:4:8 in foundation with Cement, Stone Ballast size 20 to 40 mm and Coarse Sand F.M. not less than 2, with all lead- lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
First class brick work in Cement Mortar 1:4 with Coarse Sand F.M. not less than 2 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Supplying, Cutting, bending, binding and placing in position mild steel Reinforcement as per Drawing provided with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Centering and Shuttering for R.C.C. work with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
R.C.C. in 1:1.5:3 with Cement, Dalla grit size 10 to 20 mm and Coarse Sand F.M. not less than 2 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Supplying & Installing and erection of RCC Prestressed plank of size (2100mmx300mmx50mm) with 4bars of 3mm HTS steel with M-30 grade of concrete and Precast Prestressed column of size(150mmx150mmx07 feet) with 7 bars of 3mm HTS steel with M-30 grade of concrete with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Cement Pointing in Cement Mortar 1:2 with Cement, Coarse Sand F.M. not less than 2 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
S.R. INFRACONSTRUCTION PVT LTD
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .