Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Deepening and Improvements to the Ooranies_11 nos. in AGAMT-II-2021-22 Village panchayats of Melur Block in Madurai District in Package no.Mel_01
2022_RDTN_240216_1
568/2022/D7Mel01/24.06.22
Open Tender
Civil Works
Item Rate
180 days
melur
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹86,000
1 Aug 2022
8 Jul 2022
22 Jul 2022
8 Jul 2022
22 Jul 2022
9 Jul 2022
90 days
Amount
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E SURESH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .