Loading…
Loading…
Tender Value
₹4.8 Cr
EMD Value
₹9.5 L
Closing Date
15 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
CIVIL
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (Refer details in tender document).
Definition of Similar nature of Work:- ("Any Civil work other than EOT Track, Horticulture, Sanitation & P.Way work")
17 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Quoted Rates shall be inclusive of all statutory taxes like GST, building cess, any allowance, license fee, royalty charges etc. as legally leviable by State, Central Government and/or any other local body/authority.
The tenderer(s) should deposit payment of EPF/ESI with the authority concerned for the preceding month of the wages month irrespective of number of workers and upload on the IR Shramik Kalyan Portal.
To assist in the examination, evaluation & comparison and prequalification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
Tenderer should comply with the provision of EPF&ESI Scheme as modified from time to time and should registered themselves with concerned authority or submit registration issued by authority concerned within 30 days from the date of issue of (LOA), otherwise no payment will be released.
Instruction to bidder : Bidders while quoting the price must take the cognizance of the present minimum wages of labor and anticipated increase in minimum wages of labour during the period of the work. The successful Bidder will be bound to make payments of minimum wages to the labour as per rates applicable from time to time during execution of the work. The bidder shall quote rates for Schedule 03 in a manner that ensures compliance with minimum wage requirements (as per latest labour rates of CLC on the date of opening of bid) for NS- 19. Quoting rates below the applicable minimum wages will lead to summary rejection of the bid.
Maintenance and upkeep of all internal and external assets of Type-II, III & IV Qtrs including Staircases & Service building in Colony-2 area PLW, Patiala (2026-27)
T-11-2026-27
T-11-2026-27
Open
Works - General
12 Months
Patiala, Punjab
₹0
₹9.5 L
15 Jul 2026
23 Jun 2026
1 Jul 2026
22 items across 2 schedules · ₹89,35,320.39 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | NS-1 P&F PVC Tank cover of 500 ltr cap. Tank on roof of qtrs.& service bldg. | Each | 150.00 | 149.85 | 22,477.5 |
| 2 | NS-2 (A) Repair/Replacement to Steel rod bit of Sluice/Gate valve. a 100 Dia | Each | 4.00 | 405.12 | 1,620.48 |
| 3 | NS-2 (B) Repair/Replacement to Steel rod bit of Sluice/Gate valve. a 150 Dia | Each | 16.00 | 427.93 | 6,846.88 |
| 4 | NS-2 (C) Repair/Replacement to Steel rod bit of Sluice/Gate valve. a 200 Dia | Each | 4.00 | 427.93 | 1,711.72 |
| 5 | NS-2 (D) Repair/Replacement to Steel rod bit of Sluice/Gate valve. a 300 Dia | Each | 4.00 | 592.58 | 2,370.32 |
| 6 | NS-3 Removing & Treatment of unwanted plants/trees from structural surfaces at all heights upto 10 mtrs from NGL by removing plants, opening the structural surface to remove plant roots & then injecting Roundup treatment and repairing the structural surface to its original appeal with brickwork, concrete & plastering etc. as a complete job with necessary scaffolding | Each | 200.00 | 456.78 | 91,356 |
| 7 | NS-4 Item Rate for Providing and Fixing of PVC Float Valve 15 mm dia for Low Level cistern of make Tip Top or Equivalent, includes all lead, lifting any height, loading, unloading, all taxes, charges, all L&M, T&P as a complete job. Nothing Extra will be paid whatsoever the case may be. | Each | 250.00 | 85.1 | 21,275 |
| 8 | NS-5 Item Rate for Providing and Fixing of PVC Handle for Low Level cistern of make Tip Top or Equivalent, includes all lead, lifting any height, loading, unloading, all taxes, charges, all L&M, T&P as a complete job. Nothing Extra will be paid whatsoever the case may be. | Each | 250.00 | 54.76 | 13,690 |
| 9 | NS-6 Item Rate for Providing and Fixing of PVC Syphon for Low Level cistern of make Tip Top or Equivelent, includes all lead, lifting any height, loading, unloading, all taxes, charges, all L&M, T&P as a complete job. Nothing Extra will be paid whatsoever the case may be. | Each | 50.00 | 153.16 | 7,658 |
| 10 | NS-7 Repairs to rolling shutters by oiling, greasing, reverting of plates of channels etc. without any replacement of of materials. If any replacement is made, that will be paid extra under relevant USSR items. | Sqm | 50.00 | 343.47 | 17,173.5 |
| 11 | NS-8 "Testing / Calibration, overhauling of meter (water of different types) 150-200 dia" | Each | 8.00 | 6,083.44 | 48,667.52 |
| 12 | NS-9 P&F C.I Non return valve 150-200 mm dia complete with bolts, nuts, rubber inserting etc. with all labour & materials. | Each | 3.00 | 13,173.7 | 39,521.1 |
| 13 | NS-10 Item Rate Replacing of top layer 150 mm thick filter media after removing existing coarse sand & silt from rain harvesting pit, (Average thickness 150 mm) deposing out side pit in stack than shifting the same at nominated place up to lead 50mtr, Cleaning jungle, wild grouth etc. 3mtr arround harvesting pit and refilling the top layer with 150mm thick fresh coarse sand dressing the surface in level to the satisfaction of site engineer including all labour and material lead lift all taxes as acomplete job. | Each | 5.00 | 4,729.55 | 23,647.75 |
| 14 | NS-11 Refixing /fixing of barbed wire on existing dislocated/hanging on previously erected posts with wire nails, hooks, stitching bolts, binding wire etc. straight and/or cross pattern. (Rate includes drilling of holes in the post wherever required) as directed by Engineer -in- charge with all labour and material taxes, incidental charge etc. as a complete job. | per metre of barbed wire | 4000.00 | 4.01 | 16,040 |
| 15 | NS-12 Supplying of Coarse sand (Minimum zone III )l inclusive of all Taxes and incidental charges etc. as a complete job to the satisfaction of site engineer.. | cum | 40.00 | 2,018.13 | 80,725.2 |
| 16 | NS-13 Supplying of Common burnt clay F.P.S. (non modular) bricks class designation 7.5 inclusive of all Taxes and incidential charges etc. as a complete job to the satisfaction of site engineer.. | 1000 Nos. | 2000.00 | 6,281.21 | 12,562.42 |
| 17 | NS-14 Supplying of Pozolona Portland Cement/ OPC 53-grade inclusive of all Taxes and incidental charges etc. as a complete job to the satisfaction of site engineer.. | Tonne | 5.00 | 6,842.28 | 34,211.4 |
| 18 | NS-15 Supplying and applying epoxy mortars (average thickness 5mm) over leached, honey combed, spalled concrete surface and exposed steel reinforcement after thorough cleaning of the exposed concrete/ reinforcement with wire brush, etc. complete as per specification. Note: This item is to be paid for only where concreting of the defective work was not the responsibility of the same contractor. | Sqm | 140.00 | 2,439.59 | 3,41,542.6 |
| 19 | NS-16 Rubbing/polishing of old floors,Terrazzo or mosaic/Marble/ skirting and dado including treads and risers of steps of terrazzo/terrazzo tiles plain or chequered, kota stone, marble tiles etc. with fine grade carborandum stone with machine or manually complete | Sqm | 100.00 | 162.32 | 16,232 |
| 20 | NS-17 Hiring of JCB/Hitachi for levelling and dressing ground/dismantling structures,Removal of jungle, clearing of earth, lowering high cess etc., along side the track between up and down lines obstructing drainages of rain water, clearing of bushes obstructing visibility at curves and Level Crossings with all lead and lift etc. complete and as directed by the Engineer-in- charge .All labour, tools and plants consumables stores including supply of JCB/Hitachi with crew to be provided by the contractor at his own cost. The contractor shall arrange road permit f o r vehicle for all the States of operation, as per instructions of engineer in-charge a n d vehicle shall n o t be m o r e t h a n three years old. Payment shall be made for actual working hours at site. | Hour | 150.00 | 1,082.14 | 1,62,321 |
| 21 | NS-18 Item Rate for providing and fixing at site Pre-fabricated MS steel Cupboard shutters (Steel Almirah Type). Made from 20 SWG thickness including handle & round bar locking arrangement, Hasp & Staple Lock (Stainless Steel), Good quality M.S. Hinges & Tower bolt, cloth hook, M.S. Sheet Shelves (if required) and Frame for shutter to be fabricated with 20 SWG MS Sheet, with welding/Riveting/Bolting etc. with all to be finished by Metallic Paint to provide smooth and finished surface. This also includes Dismantling of existing wooden Cup Boards Shutters & Shelves (if required) etc. including material, labour, freight and all taxes & levies as a complete job to the satisfaction of engineer-in- charge | Kg | 700.00 | 133.5 | 93,450 |
| Schedule total | ₹10,55,100.39 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1to11merged_merged_compressed- ACSmerged
ATTACHMENT
CECIRCULAR630merged.pdf
ATTACHMENT
Spdata.pdf
ATTACHMENT
Tdocs.pdf
ATTACHMENT
AnnexA.pdf
ATTACHMENT
ACS-1to11merged_merged_compressed-compressed1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .