Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Mar 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Budgam
Rural Engineering Complex Budgam
Construction of P-Bund on Ramzan Mir Mohallah at Darwan Pakherpora
2022_RDPR_162778_24
NIT_129_ REW BUDGAM OF 2021-22
Open Tender
Civil Works
Item Rate
20 days
DARWAN PAKHERPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Rural Development and Panchayati Raj
Exempted
9 Mar 2022
3 Mar 2022
9 Mar 2022
3 Mar 2022
8 Mar 2022
3 Mar 2022
30 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil
Providing and laying of nallah stone solling tightly hand packed
Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregate 20 mm nominal size)
12mm thick cement plaster 1: 4 mix
Carriage Charges of cement for 5 Kms average lead from Source to site of work
Carriage Charges of sand for 45 Kms average lead from Source to site of work
Carriage Charges of C.Aggs for 40 Kms average lead from Source to site of work
Carriage Charges of stone solling for 40 Kms average lead from Source to site of work
Provision for Photographs, signboard and other unforeseen items
M/S AFREEN FAROOQ
M/S JAHANGIR AHMAD MIR
M/S MUSHTAQ AHMAD MIR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .