Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 8 6B P K ROY CHOWDHURY 1ST BYE LANE HOWRAH 711103 | HOWRAH | HOWRAH | WEST BENGAL | 711103 | ₹4.6 L | L1 | Accepted-AOC Successful Bidder |
| 2 | L2₹4.6 LRejected-Finance 26 RAMKRISHNA PALLY DAKSHIN BAKSHARA HOWRAH 711 109 | HOWRAH | WEST BENGAL | 711109 | ₹4.6 L | L2 | Rejected-Finance Bidder is not L1 |
| 3 | L3₹4.6 LRejected-Finance | ₹4.6 L | L3 | Rejected-Finance Bidder is not L1 |
| 4 | Rejected-Technical 81 7A RAJA S C MALLICK ROAD KOLKATA 700047 | KOLKATA | KOLKATA | WEST BENGAL | 700047 | - | - | Rejected-Technical Documents not submitted as per NIT |
| 5 | Rejected-Technical AG 112 SALT LAKE CITY SECTOR II UNIT 608 6TH FLOOR KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical Documents not submitted as per NIT |
Tender Value
₹4.6 L
EMD Value
₹9,185
Closing Date
7 Feb 2026, 12:00 pmClosed
AE,KWSD-I,PWD
N.S.Building
Restoration of damaged Ceiling of Ground Floor in the Eastern Wing of the Main Academic Building in Ballygunge Science College Campus during the year 2025-2026. Phase-I (North-East)
2026_PWD_991515_1
WBPWD/KWSD-I/AE/eNIT-41/25-26
Open Tender
CIVIL WORKS
Percentage
15 days
Ballygunge Science College
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,185
Yes
20 Aug 2026
20 Jan 2026
9 Feb 2026
30 Jan 2026
7 Feb 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof. | 76.08 | Sqm. | 50 | ₹3,804 |
| 2 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof. | 11.41 | Cum. | 1,956 | ₹22,317.96 |
| 3 | Supplying and application of chemical for post installed rebar connection by using ETA approved for seismic criteria in rebar connection, including drilling hole to the required depth by rotary hammer drill, cleaning with bof clean air, filling chemical using serrated noule to eliminate mixing errand in a voldless manner including charges for all tools & plants. Application to be designed for post Installed rebars as per ECZ/TR023 or relevant tested.
Cost of post installed rebarring application with chemical as specified for 10 mm dia per cm of depth. | 1,670 | Cm. | 18 | ₹30,060 |
| 3.01 | Cost of post installed rebarring application with chemical as specified for 25 mm dia per cm of depth. | 400 | Cm. | 63 | ₹25,200 |
| 4 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). | 26.7 | Sqm. | 309 | ₹8,250.3 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 95.1 | Sqm. | 369 | ₹35,091.9 |
| 5.01 | (e) Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m) | 599.77 | Cum. | 61 | ₹36,585.97 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety | 11.41 | Cum. | 5,759.89 | ₹65,720.34 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | - | Mtr. | 54,915.1 | - |
| 8 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
In ground floor.
3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).
Using grey cement
(ii) 25 mm. thick | 45.65 | Sqm. | 264.81 | ₹12,088.58 |
stage.html
html • 0.16 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_2424192.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].