| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | ₹17.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.2 L+₹43,344.66 (2.44%)Rejected-AOC | ₹18.2 L+₹43,344.66 (2.44%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | K R SENTHILKUMAR L2 | VICTORY CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete | 152.15 | Cum | 300 ₹45,645 | 235 ₹35,755.25 Lowest |
| 2.00 | P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 16.3 | Cum | 5,700 ₹92,910 | 5,357.02 ₹87,319.43 Lowest |
| 3.00 | C.C 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 92.09 | cum | 5,900 ₹5,43,331 | 5,686.53 ₹5,23,672.55 Lowest |
| 4.00 | C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 49.25 | Cum | 6,750 ₹3,32,437.5 Lowest | 6,753.25 ₹3,32,597.56 |
| 5.00 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete | 1.8 | MT | 91,000 ₹1,63,800 | 90,025.52 ₹1,62,045.94 Lowest |
| 6.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 16.2 | Cum | 9,074.23 ₹1,47,002.53 Lowest | 9,074.23 ₹1,47,002.53 Lowest |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for plane Below GL | 259.76 | Sqm | 514.5 ₹1,33,646.52 Lowest | 514.5 ₹1,33,646.52 Lowest |
| 8.00 | Supplying and erecting centering shuttering including necessary supports for plane Above GL | 63.96 | Sqm | 1,029 ₹65,814.84 Lowest | 1,029 ₹65,814.84 Lowest |
| 9.00 | Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab | 22.5 | sqm | 479 ₹10,777.5 Lowest | 479 ₹10,777.5 Lowest |
| 10.00 | Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab | 6.75 | sqm | 150 ₹1,012.5 Lowest | 150 ₹1,012.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
14 Jul 2025, 3:00 pmClosed
Block Development officer, Arcot
Block Development office, Arcot
Construction of Culvert at Anathangal Kurumudithangal Road H/O Arumbakkam panchyat
2025_RDTN_578758_1
A2/1249/2025
Open Tender
Civil Works
Works
30 days
Block Development office, Arcot
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹18,000
9 Jul 2026
7 Jul 2025
14 Jul 2025
7 Jul 2025
14 Jul 2025
7 Jul 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete
P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
C.C 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
Supplying and erecting centering shuttering including necessary supports for plane Below GL
Supplying and erecting centering shuttering including necessary supports for plane Above GL
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
K R SENTHILKUMAR (BID ID -1400818)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .