Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -36.51% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹8.8 L (2.95%)Admitted-Finance | -34.64% | ₹3.1 Cr+₹8.8 L (2.95%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹21.2 L (7.12%)Admitted-Finance | -31.99% | ₹3.2 Cr+₹21.2 L (7.12%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹35.3 L (11.8%)Admitted-Finance | -29.00% | ₹3.3 Cr+₹35.3 L (11.8%) | L4 | Admitted-Finance |
| 5 | L5₹3.4 Cr+₹38.3 L (12.8%)Admitted-Finance | -28.37% | ₹3.4 Cr+₹38.3 L (12.8%) | L5 | Admitted-Finance |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
9 Mar 2026, 6:00 pmClosed
Executive Engineer RnB Div Sgr Core
Office of the Executive Engineer RnB Div Sgr Core
Construction of District Ayush Office at Barbar shah Srinagar.
2026_PWDJK_303600_1
77 of RNB//Sgr-Core/2025-26
Open Tender
Civil Works
Percentage
545 days
srinagar
refer nit
5 documents required · 5 mandatory
₹5,500
Executive Engineer RnB Div Sgr Core
₹9.4 L
Office of the SE RnB Circle Sgr North
7 Apr 2026
17 Feb 2026
10 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL | |||||
| 1.01 | Earth work in bulk excavation by mechanical means in trenches and foundation (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soils | 1 | Cums | 256.85 | ₹256.59 |
| 1.02 | P/L dry Stone Soling duly hand packed & consolidated with hand rammers incl.all carriage leads and lifts complete Job. | - | Cums | 950 | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) PCC below Foundation& rooms-Mudmat including carriage. | - | Cums | 5,202.9 | - |
| 1.04 | Dismantelling old structure and allied works on site including site clearagnce and removal of all debris and vegitation to provide a working area for further construction complete including all carriage leads and lifts | - | C JOB | 2,00,000 | - |
| 1.05 | PILE WORK: Boring, providing and installing 600 mm dia bored cast-in-stu reinforced cement concrete pile of M25 conrete garde mix to carry a safe load working load not less than the specified, excluding the cost of steel reinforecement but including cost of boring with bentonite solution and temporary casing of appropriate length all complete including removal of excavated earth with all leads and lifts (Lenght of pile for payment shall be measured from top of pile shoe to bottom of pile cap. | - | mtr | 3,095.25 | - |
| 1.06 | PILE LOAD TEST: Vertical Load testinf of piles on accordance with IS: 2911 (Part IV) including installation of Loading Platform by Kentledge /Anchor pile Method and preperation of pile head or construction of test cap and dismantling of test cap after test etc complete as per specification and the direction of EIC Initial Test | - | per test | 1,59,533 | - |
| 1.07 | PILE LOAD TEST: Vertical Load testinf of piles on accordance with IS: 2911 (Part IV) including installation of Loading Platform by Kentledge /Anchor pile Method and preperation of pile head or construction of test cap and dismantling of test cap after test etc complete as per specification and the direction of EIC Routine Test | - | per test | 1,75,486 | - |
| 1.08 | CAST-IN-STU DESIGN MIX M25: Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,using cement content as per approved design mix,incluyding pumping of concrete to site laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportiond as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable seperately all works Below Plinth Levl / Above Plinth Level upto level V (AGL/BGL).. | 0.2 | Cums | 8,021.1 | ₹1,604.22 |
| 1.09 | Providing and laying in position specified grade of reinforced cement concrete, including curing but excluding the cost of centering, shuttering, finishing and reinforcement.- All work upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cums | 7,788.4 | ₹7,780.61 |
stage.html
html • 0.04 MB
technical_985928.pdf
techsummary_985928.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Tendernotice_2.pdf
PDF • 1.01 MB
Tendernotice_3.pdf
PDF • 9.71 MB
BOQ_985928.xls
BOQ • 0.59 MB
cc.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .