| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L Quoted ₹3.0 L | L1 | Accepted-AOC Accepted as bidder found L1 |
| 2 | L2₹3.1 LRejected-AOC | ₹3.1 L | L2 | Rejected-AOC Rejected as bidder found L2 |
| 3 | L3₹3.2 LRejected-AOC VILL REOG PO BHALAOG TEHSIL KUMARSAIN DISTT SHIMLA HP | KUMARSAIN | SHIMLA | HIMACHAL PRADESH | ₹3.2 L | L3 | Rejected-AOC Rejected as bidder found L3 |
| Sl No | Description | Qty | Unit | SUMIT SINGH RATHORE L1 | SUNIL DUTT L3 | RAHUL L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. In earthwork lift 1.5 m, stacking the excavated soil not more than 3 m clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation etc., consolidateing each deposited layer by ramming and watering and then disposing off all surplus excavated earth as directed within a lead of 20 m in pick and jumper work (for retaining wall). | 11.23 | Cum. | 645 ₹7,244.64 | 750 ₹8,424 | 700 ₹7,862.40 |
| 2.00 | Providing and laying CC 1:6:12 (1 Cement : 6 Sand : 12 Graded Stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 2.98 | Cum. | 9,600 ₹28,617.60 | 10,500 ₹31,300.50 | 10,000 ₹29,810 |
| 3.00Providing Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies, height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in. | ||||||
| 3.01 | Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like : | 50.84 | Sqm. | 472 ₹23,996.48 | 550 ₹27,962 | 480 ₹24,403.20 |
| 4.00 | Providing and laying of cement concrete 1:5:10 ( 1 Cement : 5 Sand : 10 Graded Stone aggregate 40 mm nominal size ) with 15% plum in R/ Wall & B/ Wall. | 19.15 | Cum. | 10,000 ₹1.9 L | 10,100 ₹1.9 L | 10,000 ₹1.9 L |
| 5.00 | Stone filling behind retaining wall and breast wall. | 8.64 | Cum. | 5,600 ₹48,384 | 6,400 ₹55,296 | 6,000 ₹51,840 |
Tender Value
₹2.9 L
EMD Value
₹5,700
Closing Date
21 Jan 2026, 11:00 amClosed
Executive Engineer Jal Shakti Division Matiana
O/o Executive Engineer Jal Shakti Division Matiana
C O retaining wall for the protection of newly constructed water storage tank for flushing system
2026_HPIPH_125714_1
JSV-Matiana-Tender-10543-93 Dated-14.01.2026-6
Open Tender
Civil Works
180 days
Narkanda
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
EE Matiana
₹5,700
28 Apr 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
Excavation in foundation and trenches etc. In earthwork lift 1.5 m, stacking the excavated soil not more than 3 m clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation etc., consolidateing each deposited layer by ramming and watering and then disposing off all surplus excavated earth as directed within a lead of 20 m in pick and jumper work (for retaining wall).
Providing and laying CC 1:6:12 (1 Cement : 6 Sand : 12 Graded Stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth.
Providing Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies, height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in.
Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like :
Providing and laying of cement concrete 1:5:10 ( 1 Cement : 5 Sand : 10 Graded Stone aggregate 40 mm nominal size ) with 15% plum in R/ Wall & B/ Wall.
Stone filling behind retaining wall and breast wall.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
form6.pdf
Tender Documents • 0.29 MB
form8.pdf
Tender Documents • 1.41 MB
Termsandconditions.pdf
Tender Documents • 0.14 MB
BOQ_185283.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid