| 1 | L1₹6.3 CrAccepted-AOC NO 17 WABAG HOUSE 200 FEET THORAIPAKKAM PALLAVARAM MAIN ROAD SUNNAMBU KOLATHUR CHENNAI KANCHIPURAM TAMIL NADU 600117 | CHENGALPATTU | TAMIL NADU | 600117 | ₹6.3 Cr | L1 | Accepted-AOC QUOTED LOWEST |
| 2 | L2₹7.2 CrRejected-Finance | ₹7.2 Cr | L2 | Rejected-Finance QUOTED 2ND LOWEST |
| 3 | L3₹73.6 CrRejected-Finance | ₹73.6 Cr | L3 | Rejected-Finance QUOTED HIGHEST |
| Sl No | Description | Qty | Unit | M/s, TRIGONE AND COMPANY L2 | VA Tech Wabag Limited L1 | Traders and Engineers Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station. (For the period of first 12 months). | 12 | month | 19,34,000 ₹2.3 Cr | 18,82,000 ₹2.3 Cr | 1,98,00,000 ₹23.8 Cr |
| 1.10Labour component (Approx. 37% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect. | ||||||
| 1.20Other than labour component (Approx. 63% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined. | ||||||
| 2.00 | Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station(For the period of subsequect 12 months). | 12 | month | 19,95,327.14 ₹2.4 Cr | 19,41,678.22 ₹2.3 Cr | 2,04,27,858 ₹24.5 Cr |
| 2.10Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | ||||||
| 2.20Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | ||||||
| 3.00 | Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station(For the period of subsequect 12 months). | 12 | month | 20,59,720.64 ₹2.5 Cr | 20,04,340.35 ₹2.4 Cr | 2,10,87,108.9 ₹25.3 Cr |
| 3.10Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | ||||||
| 3.20Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | ||||||
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
25 Aug 2025, 1:00 pmClosed
THE DIRECTOR GENERAL (WATER SUPPLY)
5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pumping Station of Garden Reach Water Works for three years.
2025_KMC_880590_1
KMC/WS/GRWW/T-01/2025-26
Open Tender
Project Work
1095 days
Garden Reach Water Works, Bidhangarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10 L
OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY)
30 Mar 2026
18 Jul 2025
27 Aug 2025
19 Jul 2025
25 Aug 2025
26 Jul 2025
23 Jul 2025
Amount
Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station. (For the period of first 12 months).
Labour component (Approx. 37% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect.
Other than labour component (Approx. 63% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined.
Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station(For the period of subsequect 12 months).
Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
Operation & Maintenance of 25 MGD capacity Water Treatment Plant, Clear Water Pump House of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 25 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 25 MGD WTP and Clear Water Pumping Station(For the period of subsequect 12 months).
Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
M/s, TRIGONE AND COMPANY (BID ID -6862730)
Traders and Engineers Private Limited (BID ID -6813414)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1985257.xls
BOQ • 0.34 MB
TBidfinal.pdf
Tender Documents • 1.55 MB
Download all tender documents and submit your bid