Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 CrAccepted-AOC N A | L1 | Accepted-AOC accepted | |
| 2 | L2₹18.8 Cr+₹6.0 L (0.32%)Rejected-AOC MUDKI ROAD BAGHA PURANA DISTT MOGA | MOGA | PUNJAB | 142001 | L2 | Rejected-AOC rejectef |
Tender Value
₹18.9 Cr
EMD Value
₹37.8 L
Closing Date
30 Dec 2025, 11:00 amClosed
EE Construction Divison PWD Moga
EE Construction Division PWD Moga
Modernization of overlay widening and new construction of link road special assistance 2025 to 2026 Group No. 2
2025_CEPW_154993_1
Bid no. 33 date 24.11.2025
Open Tender
Civil Works - Roads
Percentage
360 days
Moga
Please refer Tender documents.
2 documents required · 2 mandatory
₹50,000
₹37.8 L
19 Feb 2026
29 Nov 2025
30 Dec 2025
29 Nov 2025
30 Dec 2025
29 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part I (Construction) | - | - | - | - |
| 2 | Raising Portion
Dismantling brick edging in strengthening portion include sorting and stacking dismantled material Complete | 919.78 | Cum | 144.33 | ₹1,32,751.85 |
| 3 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr | 5,935.25 | Cum | 33.71 | ₹2,00,077.28 |
| 4 | Dismantling of Stone Pitching | 507.83 | Cum | 184.36 | ₹93,623.54 |
| 5 | Compaction of earthwork and preparation of sub-grade including loosening leveling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in table 300-2 as per technical clause 305 of MORT&H Specifications. | 86,350 | sqm | 6.32 | ₹5,45,732 |
| 6 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | 72,730 | Mtr | 76.02 | ₹55,28,934.6 |
| 7 | Relaying of recovered material obtained from dismantling of road crust as Construction of granular sub-base by providing coarse graded material grading-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications | 304.7 | Cum | 146.44 | ₹44,620.27 |
| 8 | Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications | 6,486.56 | Cum | 1,700.24 | ₹1,10,28,708.77 |
| 9 | Water Bound Macadam Grading I (withoutscreening for low volume Roads/undersigned Roads Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications | 4,732.78 | Cum | 2,075.94 | ₹98,24,967.31 |
| 10 | Water Bound Macadam Grading II (without screening for low volume Roads/undersigned Roads Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8- 10 tonnes in stages to proper grade and camber, applying and brooming Water Bound Macadam Grading II requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications without screeening | 14,344.11 | Cum | 2,075.84 | ₹2,97,76,077.3 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
SBD1.pdf
Tender Documents • 2.15 MB
SBD2.pdf
Tender Documents • 24.11 MB
BOQ_314056.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .