Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 CrAccepted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | ULTRAPOWER BUILDERS L1 |
|---|---|---|---|---|
| 1.00 | Clearing of juli flora jungle disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all Labour charges, Lead, Lift, T&Ps etc., complete. | 400 | M2 | 5 ₹2,000 Lowest |
| 2.00 | Removing of black top road and disposed away from the site as directed by the Engineer including cost of labour specification complete. | 288 | M3 | 1,500 ₹4,32,000 Lowest |
| 3.00 | Earth work excavatin in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small size boulders etc., complete as per standard specification complete | 1,025 | M3 | 1,500 ₹15,37,500 Lowest |
| 4.00 | Earth work Excavation and depositing on bank with initial lead of 10 metre and lift of 2 metre in soft disintegrated rock, laterite soft rock or kankar not requiring blasting including all leads, lifts etc., as per standard specification complete | 820 | M3 | 1,500 ₹12,30,000 Lowest |
| 5.00 | Earth work Excavation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete. | 205 | M3 | 1,500 ₹3,07,500 Lowest |
| 6.00 | Supplying and filling the trench with M sand along the cable route as per standard specification, including cost of all materials, labour, lead, lift etc., complete. | 430 | M3 | 3,000 ₹12,90,000 Lowest |
| 7.00 | Transporting and laying of RCC 1:1.5:3 mix UG cable cover slab from casting yard to work site placing in position as required at site. | 2,025 | M3 | 750 ₹15,18,750 Lowest |
| 8.00 | PCC 1:3:6 using 20mm metal for tower foundation concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. | 193 | M3 | 6,000 ₹11,58,000 Lowest |
| 9.00 | PCC 1:2:4 using 20mm metal for cable joint bay padding concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. | 8.1 | M3 | 7,500 ₹60,750 Lowest |
| 10.00 | Brick work in C.M. 1:3 using chamber burnt class II bricks, for cable joint bay in below ground level including, cost of cement, all materials, labour, curing, all leads and lifts, etc complete as per Standard Specification. | 45 | M3 | 12,000 ₹5,40,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹7.1 L
Closing Date
16 Feb 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
The Conversion of OH Bethaniyapuram Ward No. 63 65 Madurai Corporation under Madurai UTM No.106
2026_EB_654523_1
CE/TP SO/MDU Specn.No.017/2025-26
Open Tender
Civil Works
Works
365 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.1 L
2 Jul 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of juli flora jungle disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all Labour charges, Lead, Lift, T&Ps etc., complete. | 400 | M2 | - | - |
| 2 | Removing of black top road and disposed away from the site as directed by the Engineer including cost of labour specification complete. | 288 | M3 | - | - |
| 3 | Earth work excavatin in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small size boulders etc., complete as per standard specification complete | 1,025 | M3 | - | - |
| 4 | Earth work Excavation and depositing on bank with initial lead of 10 metre and lift of 2 metre in soft disintegrated rock, laterite soft rock or kankar not requiring blasting including all leads, lifts etc., as per standard specification complete | 820 | M3 | - | - |
| 5 | Earth work Excavation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete. | 205 | M3 | - | - |
| 6 | Supplying and filling the trench with M sand along the cable route as per standard specification, including cost of all materials, labour, lead, lift etc., complete. | 430 | M3 | - | - |
| 7 | Transporting and laying of RCC 1:1.5:3 mix UG cable cover slab from casting yard to work site placing in position as required at site. | 2,025 | M3 | - | - |
| 8 | PCC 1:3:6 using 20mm metal for tower foundation concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. | 193 | M3 | - | - |
| 9 | PCC 1:2:4 using 20mm metal for cable joint bay padding concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. | 8.1 | M3 | - | - |
| 10 | Brick work in C.M. 1:3 using chamber burnt class II bricks, for cable joint bay in below ground level including, cost of cement, all materials, labour, curing, all leads and lifts, etc complete as per Standard Specification. | 45 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_784823.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .