| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.3 L+₹1.1 L (12.9%)Admitted-Fee/PreQual/Technical/Finance | ₹9.3 L+₹1.1 L (12.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RP INFRASTRUCTURES L2 | GAssociates L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling damaged RCC slab etc. complete as per direction of departmental officers etc. completed. | 4 | M3 | 3,500 ₹14,000 Lowest | 4,057.58 ₹16,230.32 |
| 2.00 | Desilting the existing storm water drain etc. complete as per direction of departmental officers etc. completed. | 42 | M3 | 95 ₹3,990 | 93.21 ₹3,914.89 Lowest |
| 3.00 | Dismantling damaged plain cement concrete etc. complete as per direction of departmental officers etc. completed. | 24 | M3 | 400 ₹9,600 Lowest | 457.86 ₹10,988.57 |
| 4.00 | Earth work Excavation in all soild with initial lead and lift etc., complete for drain | 171 | M3 | 200 ₹34,200 | 176.02 ₹30,099.76 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 33 | M3 | 5,900 ₹1,94,700 | 4,770.2 ₹1,57,416.47 Lowest |
| 6.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc., | 494 | M2 | 400 ₹1,97,600 Lowest | 427.33 ₹2,11,102.7 |
| 7.00 | Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 51 | M³ | 6,700 ₹3,41,700 | 5,377.92 ₹2,74,273.93 Lowest |
| 8.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 80 | M2 | 250 ₹20,000 | 247.69 ₹19,814.96 Lowest |
| 9.00 | Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 14 | M2 | 900 ₹12,600 | 854.66 ₹11,965.22 Lowest |
| 10.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers. | 4 | Qtl | 9,000 ₹36,000 | 7,634.67 ₹30,538.7 Lowest |
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Reconstruction of storm water drain and culvert at Ganesh Layout 7th street in Ward No 30, North zone
2026_MAWS_694689_6
e55/2026-NZ Single
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per tender documents
5 documents required · 5 mandatory
₹0
₹12,500
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling damaged RCC slab etc. complete as per direction of departmental officers etc. completed. | 4 | M3 | - | - |
| 2 | Desilting the existing storm water drain etc. complete as per direction of departmental officers etc. completed. | 42 | M3 | - | - |
| 3 | Dismantling damaged plain cement concrete etc. complete as per direction of departmental officers etc. completed. | 24 | M3 | - | - |
| 4 | Earth work Excavation in all soild with initial lead and lift etc., complete for drain | 171 | M3 | - | - |
| 5 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 33 | M3 | - | - |
| 6 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc., | 494 | M2 | - | - |
| 7 | Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 51 | M³ | - | - |
| 8 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 80 | M2 | - | - |
| 9 | Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 14 | M2 | - | - |
| 10 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers. | 4 | Qtl | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_835256.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .