| 1 | L1₹2.9 LAccepted-AOC AT ARGADA DISTT RAMGARH JHARKHAND | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | L2₹3.7 L+₹77,390 (26.3%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance Rejected as L2 as per NIT | |
| 3 | L3₹4.6 L+₹1.7 L (56.2%)Rejected-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L3 | Rejected-Finance Rejected as L3 as per NIT | |
| 4 | L4₹4.8 L+₹1.9 L (63.8%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L4 | Rejected-Finance Rejected as L4 as per NIT |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L3 | coalfields engineering works L4 | CENTRAL ENGINEERS L2 | Maa Katyayani Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Supply of winding temperature meter for 2.5 MVA and 3MVA, 11KV/3.3KV Transformer at 2 no. substation considering DGMS guidline and safety of the equipment under Kathara Colliery. | 2 | No | 27,000 ₹54,000 | 28,250 ₹56,500 | 15,000 ₹30,000 Lowest | 17,250 ₹34,500 |
| 1.02 | Supply of oil Temperature meter for 2.5 MVA and 3MVA, 11KV/3.3 KV transformer | 2 | No | 27,000 ₹54,000 | 28,250 ₹56,500 | 15,000 ₹30,000 Lowest | 17,250 ₹34,500 |
| 1.03 | Supply of buchholz relay for 2.5 MVA and 3MVA, 11KV/3.3KV transformer | 2 | No | 23,000 ₹46,000 | 23,940 ₹47,880 | 45,000 ₹90,000 | 14,620 ₹29,240 Lowest |
| 1.04 | Supply of breather with silica gel set for 2.5MVA and MVA, 11KV/3.3KV transformer. | 2 | No | 11,000 ₹22,000 | 11,491 ₹22,982 | 10,500 ₹21,000 | 7,015 ₹14,030 Lowest |
| 1.05 | Supply of hooter for 2.5MVA and 3MVA, 11KV/3.3KV transformer | 2 | No | 4,580 ₹9,160 | 4,790 ₹9,580 | 600 ₹1,200 Lowest | 2,925 ₹5,850 |
| 1.06 | Cost of HT Bushing insulator with stud for 2.5MVA and 3MVA, 11KV/3.3KV transformer 3+3= 6 no. | 6 | No | 9,950 ₹59,700 | 10,400 ₹62,400 | 3,800 ₹22,800 Lowest | 6,350 ₹38,100 |
| 1.07 | Cost of LT bushing insulator with stud for 2.5MVA and 3MVA, 11KV/3.3KV Transformer 3+3 =6 No. | 6 | No | 9,950 ₹59,700 | 10,400 ₹62,400 | 4,000 ₹24,000 Lowest | 6,350 ₹38,100 |
| 1.08 | Painting with Grey paint: 10Lx2No=20L | 20 | L | 260 ₹5,200 | 270 ₹5,400 | 500 ₹10,000 | 165 ₹3,300 Lowest |
| 1.09 | Painting with thinner: 10Lx2No= 20L | 20 | L | 130 ₹2,600 | 135 ₹2,700 | 500 ₹10,000 | 85 ₹1,700 Lowest |
| 1.10 | Cost of washing soda: 8Kg x 2 No=16 Kg | 16 | Kg | 120 ₹1,920 | 125 ₹2,000 | 100 ₹1,600 | 75 ₹1,200 Lowest |
Tender Value
₹5.0 L
EMD Value
₹6,300
Closing Date
7 Jul 2025, 4:00 pmClosed
Colliery Manager (M), Manager(F), P.E(EnM)
Colliery Manager (M),Manager(F),Project Engineer(EnM)
Repairing and fixing of WTI and OIT and buchholz relay along with painting of one (01) no. 11KV/3.3KV, 3MVA and one no. 11KV/3.3KV, 2.5 MVA transformer at 02 no. sub-station considering DGMS guideline and safety of the equipment under katahra collier
2025_CCL_338353_1
KTC/PE/EnM/25-26/18 date-26.06.2025
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Office of the Project Officer, PE (EnM), Kathara C
Repairing and fixing of WTI and OIT and buchholz relay along with painting of one (01) no. 11KV/3.3KV, 3MVA and one no. 11KV/3.3KV, 2.5 MVA transformer at 02 no. sub-station considering DGMS guideline and safety of the equipment under katahra collier
6 documents required · 6 mandatory
₹6,300
Yes
13 Sept 2025
25 Jun 2025
8 Jul 2025
26 Jun 2025
7 Jul 2025
26 Jun 2025
26 Jun 2025 - 3 Jul 2025
Amount
Supply of winding temperature meter for 2.5 MVA and 3MVA, 11KV/3.3KV Transformer at 2 no. substation considering DGMS guidline and safety of the equipment under Kathara Colliery.
Supply of oil Temperature meter for 2.5 MVA and 3MVA, 11KV/3.3 KV transformer
Supply of buchholz relay for 2.5 MVA and 3MVA, 11KV/3.3KV transformer
Supply of breather with silica gel set for 2.5MVA and MVA, 11KV/3.3KV transformer.
Supply of hooter for 2.5MVA and 3MVA, 11KV/3.3KV transformer
Cost of HT Bushing insulator with stud for 2.5MVA and 3MVA, 11KV/3.3KV transformer 3+3= 6 no.
Cost of LT bushing insulator with stud for 2.5MVA and 3MVA, 11KV/3.3KV Transformer 3+3 =6 No.
Painting with Grey paint: 10Lx2No=20L
Painting with thinner: 10Lx2No= 20L
Cost of washing soda: 8Kg x 2 No=16 Kg
Hire charges of paint machine: 2 Day each
Filter of Transformer oil: 2200Lx2=4400L (approx)
Supply of 2.5 sqmm, 6 core cable
Supply of Gasket of required size
Labour charghes
Total impact of GST for the purpose of CTC
CENTRAL ENGINEERS (BID ID -1165979)
M/S ADITYA ENTERPRISES (BID ID -1165306)
coalfields engineering works (BID ID -1165341)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .