| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance R O VILL NARAIN P O SHARONTHA TEHSIL TIKKAR DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | L1 | Accepted-Finance being L1 | |
| 2 | L2₹8.0 L+₹48,830 (6.49%)Rejected-Finance 63A SADAR BAZAAR DAGSHAI CANTT DISTT SOLAN 173210 H P | DAGSHAI | SOLAN | HIMACHAL PRADESH | 173210 | L2 | Rejected-Finance being L2 | |
| 3 | L3₹7.6 L+₹2,674 (0.36%)Rejected-Finance | L3 | Rejected-Finance being L3 |
Tender Value
₹8.9 L
EMD Value
₹17,800
Closing Date
20 Aug 2026, 11:25 amClosed
Executive Engineer HPPWD Divsion kasauli
Executive Engineer HPPWD Divsion kasauli
R/R damages to Sanawar Gate to Mandudhar Via Shillar Pathia road in Km. 0/00 to 3/500.(SH- Hiring of Excavator Cum Loader alongwith Tipper for removal of slips and C/O B/Wall in Wire Crates at Rd. 0/365 to 0/405)Under PDNA
2026_PWD_141327_1
6035-45 dated 10.08.2026
Open Tender
Civil Works
Percentage
Kasauli
As per tender document
3 documents required · 3 mandatory
₹350
₹17,800
13 Oct 2026
15 Aug 2026
20 Aug 2026
15 Aug 2026
20 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of Excavator cum loader for excavation, removal of slips, removal of slips, removal of debris & dressing of berms with a mimimum capacity of 28.00 (Twenty Eight cubic meter) per hour minimum six hour per day including pay of operators, POL charges, maintenance or any minor or major accidents and other damages to private and Govt. property is the whole responsibilities of the contractor. The work shall be executed as per the MORT&H specification and the direction of Engineer-In-Charge. | 152 | Per Hour | 1,100 | ₹1,67,200 |
| 2 | Hiring of Tipper which shall include all expenses on A/C of establishment, POL, repair & other overhead charges etc. The tipper has to perform not less than as prescribed in the norms of HP. PWD. and as per direction of Engineer in Charge, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. | 19 | Per Day | 4,000 | ₹76,000 |
| 3 | Earthwork in excavation for all type of road structures such as retaining wall, breast wall and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted) as per drawing and technical specification true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor) including trimming, dressing of sides and bottom, filling of unevenness blindages, backfilling in trenches with excavated suitable material and finishing of the road to specified dimensions or as directed by the Engineer-in-Charge. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases. | 136 | Per Cubic Metre | 278.9 | ₹37,930.4 |
| 4 | Providing and laying of boulder apron laid in wire crates with 4 mm(four milimeter) dia GI wire conforming to IS:280 (two hudred eighty) and IS:4826 (four thousand eight hundred twenty six) in 100 mm x 100 mm(one hundred into one hundred milimeter) mesh (woven diagonally) including 10(ten) per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg (twenty five kilogramme) each as per drawing and technical specifications Clause 1301,(one thousand three hundred one) including carriage of all labour equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges. | 187.5 | Per Cubic Meter | 3,252.9 | ₹6,09,918.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 6.16 MB
BOQ_209756.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .